Integrated truck and workforce scheduling to accelerate the unloading of trucks

Abstract Truck scheduling coordinates the loading and unloading processes of trucks competing for the timely processing at some terminal, e.g., a cross-docking terminal or distribution center. Existing research almost invariably assumes that the (un-)loading times of trucks are fixed. In the real-world, however, terminal managers have the additional flexibility of adapting the workforce for processing critical trucks. For instance, two instead of one worker can be assigned to jointly unload the parcels of a trailer reaching a terminal of the postal service industry onto a conveyor, or an additional forklift can support the removal of pallets from a truck in a distribution center. Thus, workforce management influences the processing times of trucks and a simultaneous planning of both tasks seems advisable. For two representative truck scheduling settings, mixed-integer models integrating workforce planning and truck scheduling are presented. Furthermore, we re-formulate the problems as interval scheduling problems and develop heuristics based on these formulations. Finally, the holistic planning models are compared with alternative models assuming a fixed workforce. Our findings reveal that integrated planning can considerably increase the performance of truck scheduling in terms of total flow time and punctuality.

[1]  Frits C. R. Spieksma,et al.  Interval scheduling: A survey , 2007 .

[2]  Ada Che,et al.  Energy-conscious unrelated parallel machine scheduling under time-of-use electricity tariffs , 2017 .

[3]  Petrica C. Pop,et al.  On the complexity of the selective graph coloring problem in some special classes of graphs , 2014, Theor. Comput. Sci..

[4]  Vernon Ning Hsu,et al.  Scheduling Truck Arrivals at an Air Cargo Terminal , 2010 .

[5]  Bernard Penz,et al.  Scheduling cross docking operations under full, partial and no information on inbound arrivals , 2011, Comput. Oper. Res..

[6]  Candace Arai Yano,et al.  Optimizing dock configuration and staffing in decentralized receiving , 1998 .

[7]  Anne-Laure Ladier,et al.  Integrating truck scheduling and employee rostering in a cross-docking platform - an iterative approach , 2015, 2015 International Conference on Industrial Engineering and Systems Management (IESM).

[8]  E.L. Lawler,et al.  Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .

[9]  Ada Che,et al.  A memetic differential evolution algorithm for energy-efficient parallel machine scheduling , 2019, Omega.

[10]  Andrew Lim,et al.  Truck dock assignment problem with operational time constraint within crossdocks , 2006, Eur. J. Oper. Res..

[11]  Stephen John Turner,et al.  A robust two-phase heuristic algorithm for the truck scheduling problem in a resource-constrained crossdock , 2012, Comput. Oper. Res..

[12]  Iris F. A. Vis,et al.  Synchronization in cross-docking networks: A research classification and framework , 2014, Eur. J. Oper. Res..

[13]  Nils Boysen,et al.  Truck Scheduling in the Postal Service Industry , 2017, Transp. Sci..

[14]  David S. Johnson,et al.  Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .

[15]  John J. Bartholdi,et al.  Reducing Labor Costs in an LTL Crossdocking Terminal , 2000, Oper. Res..

[16]  Nils Boysen,et al.  Cross dock scheduling: Classification, literature review and research agenda , 2010 .

[17]  Volker Nissen,et al.  Sub-daily Staff Scheduling for a Logistics Service Provider , 2010, KI - Künstliche Intelligenz.

[18]  Nils Boysen,et al.  Jena Research Papers in Business and Economics Truck Scheduling in Cross Docking Terminals with fixed Outbound Departures , 2010 .

[19]  John J. Bartholdi,et al.  The Best Shape for a Crossdock , 2004, Transp. Sci..

[20]  Volker Nissen,et al.  A comparison of three heuristics on a practical case of sub-daily staff scheduling , 2011, Ann. Oper. Res..

[21]  Suk Lee,et al.  Systematic development of cargo batch loading and unloading systems , 2014 .

[22]  Mostafa Zandieh,et al.  Minimizing total tardiness and earliness on unrelated parallel machines with controllable processing times , 2014, Comput. Oper. Res..

[23]  Ceyda Oguz,et al.  Parallel machine scheduling with additional resources: Notation, classification, models and solution methods , 2013, Eur. J. Oper. Res..

[24]  Rolf H. Möhring,et al.  Scheduling project networks with resource constraints and time windows , 1988 .

[25]  Christian Bierwirth,et al.  A survey of berth allocation and quay crane scheduling problems in container terminals , 2010, Eur. J. Oper. Res..

[26]  Dincer Konur,et al.  Loading Time Flexibility in Cross-Docking Systems , 2017 .

[27]  Jacek Blazewicz,et al.  Handbook on Scheduling , 2007 .

[28]  Nils Boysen,et al.  Jena Research Papers in Business and Economics Vis-à-vis vs . mixed dock door assignment : A comparison of different cross dock layouts , 2010 .

[29]  Nils Boysen,et al.  Truck scheduling at zero-inventory cross docking terminals , 2010, Comput. Oper. Res..

[30]  Marc Demange,et al.  On some applications of the selective graph coloring problem , 2015, Eur. J. Oper. Res..

[31]  Bernard Penz,et al.  Joint employee weekly timetabling and daily rostering: A decision-support tool for a logistics platform , 2014, Eur. J. Oper. Res..

[32]  Nils Boysen,et al.  Just-in-Time supermarkets for part supply in the automobile industry , 2013 .

[33]  Pius J. Egbelu,et al.  Scheduling of inbound and outbound trucks in cross docking systems with temporary storage , 2008, Eur. J. Oper. Res..

[34]  Nils Boysen,et al.  Jena Research Papers in Business and Economics Scheduling Inbound and Outbound Trucks at Cross Docking Terminals , 2007 .

[35]  Nils Boysen,et al.  Layout Planning of Sortation Conveyors in Parcel Distribution Centers , 2017, Transp. Sci..

[36]  Gülgün Alpan,et al.  Cross-docking operations: Current research versus industry practice , 2016 .

[37]  Dvir Shabtay,et al.  A survey of scheduling with controllable processing times , 2007, Discret. Appl. Math..

[38]  Christopher D. Geiger,et al.  The parcel hub scheduling problem: A simulation-based solution approach , 2005, Comput. Ind. Eng..

[39]  R. Leus,et al.  Practical Solutions for a Dock Assignment Problem with Trailer Transportation , 2011 .

[40]  Michael J. Fry,et al.  A solution framework for the multi-mode resource-constrained cross-dock scheduling problem , 2016 .

[41]  Christian Bierwirth,et al.  A follow-up survey of berth allocation and quay crane scheduling problems in container terminals , 2015, Eur. J. Oper. Res..

[42]  Sönke Hartmann,et al.  A survey of variants and extensions of the resource-constrained project scheduling problem , 2010, Eur. J. Oper. Res..

[43]  Kaveh Azadeh,et al.  Scheduling Trucks in a Cross-Dock with Mixed Service Mode Dock Doors , 2017, Transp. Sci..

[44]  Katie McConky,et al.  Energy cost minimization for unrelated parallel machine scheduling under real time and demand charge pricing , 2019, Journal of Cleaner Production.