Scheduling operations of a rail crane and container deliveries between rail and port terminals
暂无分享,去创建一个
[1] Hark Hwang,et al. Sequencing delivery and receiving operations for yard cranes in port container terminals , 2003 .
[2] K. L. Mak,et al. An effective heuristic for scheduling a yard crane to handle jobs with different ready times , 2005 .
[3] Kap Hwan Kim,et al. A crane scheduling method for port container terminals , 2004, Eur. J. Oper. Res..
[4] Gilbert Laporte,et al. A branch‐and‐cut algorithm for the quay crane scheduling problem in a container terminal , 2006 .
[5] K. L. Mak,et al. Quay crane scheduling in container terminals , 2006 .
[6] K. L. Mak,et al. Yard crane scheduling in port container terminals , 2005 .
[7] Erhan Kozan,et al. Optimising container transfers at multimodal terminals , 2000 .
[8] Lei Wang,et al. Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures , 2006 .
[9] Pierre Dejax,et al. Models and Algorithms for Container Allocation Problems on Trains in a Rapid Transshipment Shunting Yard , 1998, Transp. Sci..
[10] Kl Mak,et al. Sequencing of container pickup trucks in container yard blocks , 2004 .
[11] Y. Zhu,et al. Crane scheduling with non-crossing constraint , 2006, J. Oper. Res. Soc..
[12] Knut Alicke,et al. Modeling and optimization of the intermodal terminal Mega Hub , 2002, OR Spectr..
[13] Erhan Kozan,et al. An assignment model for dynamic load planning of intermodal trains , 2006, Comput. Oper. Res..
[14] Qiang Meng,et al. Scheduling of two-transtainer systems for loading outbound containers in port container terminals with simulated annealing algorithm , 2007 .
[15] W. C. Ng,et al. Crane scheduling in container yards with inter-crane interference , 2005, Eur. J. Oper. Res..