A new heuristic for project scheduling with a single resource constraint

Abstract A new priority based heuristic procedure is proposed for scheduling project activities. This procedure attempts to minimize the project duration while satisfying the resource constraint. Numerical comparison shows that the proposed procedure compares favorably with a recent technique (TIMGEN) introduced by Elsayed and Nasr (1986).