Exploring the challenges to industrialized residential building in China

Industrialised building (IB) is considered by many to have an important role to play in China's residential construction industry due to its potential for improved quality, productivity, efficiency, safety and sustainability. It is surprising, therefore, that although a large number of construction programmes have been completed in the country in recent years, very few have been built in this manner. Quite why this situation exists is unknown. The well-known problems with IB, such as the constraints placed on designer freedom, may be the cause. It is equally possible that, as is typical with developing countries such as China, cost or government issues dominate. On the other hand, in comparison with other countries, the construction industry in China has been widely criticised for its lack of modernity. Either way, there is an urgent need to assess and understand the hindrances to the adoption of IB in residential construction in order to identify what corrective measures, if any, need to be taken. Towards this end, we first identify a set of critical factors (CFs) for assessing the hindrances to IB adoption in China. This involves the analysis of research data collected by a questionnaire survey of experienced housing developers and professionals working in China's construction industry sector. Fuzzy set theory is used in the selection of the CFs. These CFs comprise, in rank order: higher initial cost; lack of skilled labour in IB; manufacturing capability and involvement issues and product quality problems; lack of supply chain; lack of codes and standards; and lack of government incentives, directives and promotion. The establishment of the CFs provides a basis for local construction sectors to better equip themselves for future implementation of IB. The findings also indicate a current need for formulating improved policies and strategies to encourage the further development of IB in China at present.

[1]  Mark Dodgson,et al.  What would innovation look like for us? , 2010 .

[2]  Andrew R.J. Dainty,et al.  Perspectives of UK housebuilders on the use of offsite modern methods of construction , 2007 .

[3]  Mohamed Mohamed Naim,et al.  Choice and delivery in housebuilding: lessons from Japan for UK housebuilders , 2003 .

[4]  Fatos T. Yarman-Vural,et al.  Selection of the Best Representative Feature and Membership Assignment for Content-Based Fuzzy Image Database , 2003, CIVR.

[5]  Hans-Jürgen Zimmermann,et al.  Fuzzy Set Theory - and Its Applications , 1985 .

[6]  Chi Sun Poon,et al.  The evolution of prefabricated residential building systems in Hong Kong: A review of the public and the private sector , 2009 .

[7]  E. Chan,et al.  Prefabrication and barriers to entry—a case study of public housing and institutional buildings in Hong Kong , 2006 .

[8]  Avi Friedman,et al.  Prefabricated wall systems and the North American home‐building industry , 1993 .

[9]  Alistair G.F. Gibb,et al.  Standardization and pre-assembly- distinguishing myth from reality using case study research , 2001 .

[10]  Vivian W. Y Tam,et al.  Towards adoption of prefabrication in construction , 2007 .

[11]  Keith D. Hampson,et al.  Construction 2020 - A vision for Australia's Property and Construction Industry , 2004 .

[12]  R. Yager On a general class of fuzzy connectives , 1980 .

[13]  Lars Stehn,et al.  Industrialised housing –definition and categorization of the concept , 2005 .

[14]  M. Arif,et al.  Making a case for offsite construction in China , 2010 .

[15]  ZhengYong Liu,et al.  Prefabrication Construction in Residential Building of Vanke Real Estate Company China , 2009, 2009 International Conference on Management and Service Science.

[16]  G De Valence,et al.  The new construction industry , 2008 .

[17]  Alistair G.F. Gibb,et al.  Future opportunities for offsite in the UK , 2007 .

[18]  Yu-hong Pan,et al.  Application of industrialized housing system in major cities in China : a case study of Chongqing , 2007 .

[19]  Alistair G.F. Gibb,et al.  Benefit evaluation for off‐site production in construction , 2006 .

[20]  R. Reed,et al.  Factors impeding the offsite production of housing construction in China: an investigation of current practice , 2014 .

[21]  Alistair G.F. Gibb,et al.  Re-engineering through pre-assembly: client expectations and drivers , 2003 .

[22]  R. McCutcheon,et al.  The role of industrialised building in Soviet Union housing policies , 1989 .

[23]  Martin Skitmore,et al.  Industrialized housing in China: a coin with two sides , 2012 .

[24]  Weisheng Lu,et al.  Critical Assessment Indicators for Measuring Benefits of Rural Infrastructure Investment in China , 2011 .

[25]  Chi Sun Poon,et al.  Sustainable construction aspects of using prefabrication in dense urban environment: a Hong Kong case study , 2008 .

[26]  S. Yeh,et al.  Housing a Nation: 25 Years of Public Housing in Singapore , 1985 .

[27]  Yuosre F. Badir,et al.  Industrialized Building Systems Construction in Malaysia , 2002 .

[28]  Nashwan Dawood An Integrated Intelligent Planning Approach for Modular Construction , 1996 .

[29]  David Gann,et al.  Construction as a manufacturing process? Similarities and differences between industrialized housing and car production in Japan , 1996 .

[30]  中華人民共和国国家統計局 China statistical yearbook , 1988 .

[31]  Liu Hui,et al.  Notice of RetractionOn the Road to Labor Service Problems of China Construction Industry: Chinese-featured Vocational Education and Training System , 2010, 2010 International Conference on E-Business and E-Government.