Production scheduling with discrete and renewable additional resources

In this paper an approach to planning of additional resources when scheduling operations are discussed. The considered resources are assumed to be discrete and renewable. In most research in scheduling domain, the basic and often the only type of regarded resources is a workstation. It can be understood as a machine, a device or even as a separated space on the shop floor. In many cases, during the detailed scheduling of operations the need of using more than one resource, required for its implementation, can be indicated. Resource requirements for an operation may relate to different resources or resources of the same type. Additional resources are most often referred to these human resources, tools or equipment, for which the limited availability in the manufacturing system may have an influence on the execution dates of some operations. In the paper the concept of the division into basic and additional resources and their planning method was shown. A situation in which sets of basic and additional resources are not separable - the same additional resource may be a basic resource for another operation is also considered. Scheduling of operations, including greater amount of resources can cause many difficulties, depending on whether the resource is involved in the entire time of operation, only in the selected part(s) of operation (e.g. as auxiliary staff at setup time) or cyclic - e.g. when an operator supports more than one machine, or supervises the execution of several operations. For this reason the dates and work times of resources participation in the operation can be different. Presented issues are crucial when modelling of production scheduling environment and designing of structures for the purpose of scheduling software development.

[1]  Roman Słowiński,et al.  Two Approaches to Problems of Resource Allocation Among Project Activities — A Comparative Study , 1980 .

[2]  Mariusz Piotr Hetmańczyk,et al.  The Self-Excitation Phenomenon of Quasi Shielded Inductive Proximity Switches , 2013 .

[3]  Christian Artigues,et al.  Resource-Constrained Project Scheduling: Models, Algorithms, Extensions and Applications , 2007 .

[4]  T. Dzitkowski,et al.  Active Synthesis of Discrete Systems as a Tool for Stabilisation Vibration , 2013 .

[5]  Aleksander Gwiazda,et al.  Agent-Based Systems Approach for Robotic Workcell Integration , 2014 .

[6]  Sławomir Zolkiewski Dynamical Flexibility of Complex Damped Systems Vibrating Transversally in Transportation , 2010 .

[7]  Marek Płaczek Computer Aided Analysis of Systems with MFC Actuators , 2014 .

[8]  Wojciech M. Kempa,et al.  Interaction of the Decision Maker in the Process of Production Scheduling , 2014 .

[9]  Damian Krenczyk,et al.  Predictive - Reactive Strategy for Real Time Scheduling of Manufacturing Systems , 2013 .

[10]  Erik Demeulemeester,et al.  Personnel scheduling: A literature review , 2013, Eur. J. Oper. Res..

[11]  Prapaporn Rattanatamrong,et al.  Real-time scheduling of mixture-of-experts systems with limited resources , 2010, HSCC '10.

[12]  Wojciech M. Kempa,et al.  The Graph Representation of Multivariant and Complex Processes for Production Scheduling , 2013 .

[13]  Wojciech M. Kempa,et al.  The Model of Discrete Production Scheduling System in UML Notation - Classes Diagrams , 2013 .

[14]  Ceyda Oguz,et al.  Parallel machine scheduling with additional resources: Notation, classification, models and solution methods , 2013, Eur. J. Oper. Res..

[15]  Grzegorz Ćwikła The Methodology of Development of the Manufacturing Information Acquisition System (MIAS) for Production Management , 2014 .

[16]  Rema Padman,et al.  An integrated survey of deterministic project scheduling , 2001 .