A variable neighbourhood descent algorithm for the open-pit mine production scheduling problem with metal uncertainty
暂无分享,去创建一个
[1] J. Dupacová,et al. Scenario reduction in stochastic programming: An approach using probability metrics , 2000 .
[2] Roussos Dimitrakopoulos,et al. Moving forward from traditional optimization: grade uncertainty and risk effects in open-pit design , 2002 .
[3] Amina Lamghari,et al. A diversified Tabu search approach for the open-pit mine production scheduling problem with metal uncertainty , 2012, Eur. J. Oper. Res..
[4] Roussos Dimitrakopoulos,et al. Algorithmic approach to pushback design based on stochastic programming: method, application and comparisons , 2010 .
[5] Mark Gershon. Heuristic approaches for mine planning and production scheduling , 1987 .
[6] J. Picard. Maximal Closure of a Graph and Applications to Combinatorial Problems , 1976 .
[7] Ambros M. Gleixner,et al. LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity , 2009, Comput. Oper. Res..
[8] Timothy C. Coburn,et al. Geostatistics for Natural Resources Evaluation , 2000, Technometrics.
[9] Hasan Sevim,et al. The Problem Of Production Planning In Open Pit Mines , 1998 .
[10] Gourab Sen Gupta,et al. Autonomous Robots and Agents , 2007 .
[11] Alexandra M. Newman,et al. A Review of Operations Research in Mine Planning , 2010, Interfaces.
[12] Salih Ramazan,et al. The new Fundamental Tree Algorithm for production scheduling of open pit mines , 2007, Eur. J. Oper. Res..
[13] Salih Ramazan,et al. Production scheduling with uncertain supply: a new solution to the open pit mining problem , 2013 .
[14] Alexandre Boucher,et al. Multivariate Block-Support Simulation of the Yandi Iron Ore Deposit, Western Australia , 2012, Mathematical Geosciences.
[15] John M. Wilson,et al. Introduction to Stochastic Programming , 1998, J. Oper. Res. Soc..
[16] Natashia Boland,et al. A strengthened formulation and cutting planes for the open pit mine production scheduling problem , 2010, Comput. Oper. Res..
[17] Taylor Francis Online. Transactions of the Institution of Mining and Metallurgy. Section A, Mining technology , 2000 .
[18] Robert Underwood,et al. A scheduling algorithm for open pit mines , 1996 .
[19] Jacques A. Ferland,et al. Application of a Particle Swarm Algorithm to the Capacitated Open Pit Mining Problem , 2007 .
[20] Jef Caers,et al. Representing Spatial Uncertainty Using Distances and Kernels , 2009 .
[21] Lou Caccetta,et al. An Application of Branch and Cut to Open Pit Mine Scheduling , 2003, J. Glob. Optim..
[22] Eduardo Moreno,et al. Large-scale multi-period precedence constrained knapsack problem: A mining application , 2010, Electron. Notes Discret. Math..
[23] Daniel Bienstock,et al. Solving LP Relaxations of Large-Scale Precedence Constrained Problems , 2010, IPCO.
[24] Pierre Hansen,et al. Variable neighborhood search: Principles and applications , 1998, Eur. J. Oper. Res..
[25] Thys B Johnson,et al. OPTIMUM OPEN PIT MINE PRODUCTION SCHEDULING , 1968 .
[26] R. Dimitrakopoulos,et al. Managing risk and waste mining in long-term production scheduling of open-pit mines , 2004 .
[27] Jitka Dupacová,et al. Scenario reduction in stochastic programming , 2003, Math. Program..
[28] R. Dimitrakopoulos,et al. Stochastic mine design optimisation based on simulated annealing: pit limits, production schedules, multiple orebody scenarios and sensitivity analysis , 2009 .
[29] Mohammad Waqar Ali Asad,et al. Implementing a parametric maximum flow algorithm for optimal open pit mine design under uncertain supply and demand , 2013, J. Oper. Res. Soc..
[30] I. Dumitrescu,et al. A Multistage Stochastic Programming Approach to Open Pit Mine Production Scheduling with Uncertain Geology , 2008 .