New Real Time UTC(CH) Generation Scheme at METAS: Recent Progress in Control and Calibration Methods

In the course of the year 2007, UTC(CH) will change from a computed time scale definition to one based on a realtime master clock. In preparation for this important change, the time scale generation hardware was upgraded and new control software is being developed. This paper discusses recent progress in the development of control and calibration methods used in the new time scale generation system and reports experimental results obtained during validation testing.

[1]  S. R. Stein Time scales demystified , 2003, IEEE International Frequency Control Symposium and PDA Exhibition Jointly with the 17th European Frequency and Time Forum, 2003. Proceedings of the 2003.

[2]  G. Dudle,et al.  METAS time & frequency metrology report , 2005, Proceedings of the 2005 IEEE International Frequency Control Symposium and Exposition, 2005..

[3]  Yuko Hanado,et al.  Upgrading of UTC(CRL) , 2003, IEEE International Frequency Control Symposium and PDA Exhibition Jointly with the 17th European Frequency and Time Forum, 2003. Proceedings of the 2003.

[4]  Demetrios Matsakis TIME AND FREQUENCY ACTIVITIES AT THE U , 2005 .

[5]  T. Weissert,et al.  AT2, a new time scale algorithm : AT1 plus frequency variance , 1991 .

[6]  G. Dudle,et al.  Practical performance of the UTC(CH.R) real time realization of UTC(CH) and prospects for improvement , 2004 .

[7]  Laurent-Guy Bernier A prediction method applicable to steered time scales , 2005 .