Simulation techniques for cost management and performance in construction projects in Malaysia

Purpose Simulation techniques for cost management are useful for modeling uncertainties, making decisions, and improving the accuracy of cost estimation. Despite their usefulness, the application of these techniques in construction projects seems to be uncommon in the construction sector in Malaysia. The purpose of this paper is to determine the application of simulation techniques for cost estimation and control and to assess their influence on project cost performance. Design/methodology/approach A survey questionnaire was used to collect data from 83 government agencies, consultant firms, and contractor firms in Kuala Lumpur, Malaysia. Findings The findings revealed that knowledge of respondents and usage of cost simulation techniques in the Malaysian construction industry is low. In addition, main barriers of implementing cost simulation techniques are identified. Cost performance of construction projects in Malaysia is satisfactory; however, there is no association between this performance and the application of simulation techniques. Originality/value This paper contributes to construction management field by highlighting the main simulation techniques for cost management and drawing the attention of construction professionals and contractors to implement these techniques in construction projects.

[1]  N. Ankrah,et al.  Construction Cost Management: Learning from Case Studies , 2008 .

[2]  Jian-Ping Zhang,et al.  4D Dynamic Management for Construction Planning and Resource Utilization , 2004 .

[3]  Andrew Kumiega,et al.  Quantifying Project Management Delay Cost Through Simulation Modeling , 2008 .

[4]  Rahul Kashyap,et al.  An evaluation of the applicability of 4D CAD on construction projects , 2010 .

[5]  U. Sekaran,et al.  Research Methods for Business : A Skill Building Approach (5th Edition) , 1992 .

[6]  Yuan Fang,et al.  Enhancing the logistics of construction materials through activity‐based simulation approach , 2009 .

[7]  Hussein Onn,et al.  Building Information Modeling (BIM) Application in Malaysian Construction Industry , 2013 .

[8]  Jui-Sheng Chou,et al.  Cost simulation in an item-based project involving construction engineering and management , 2011 .

[9]  David Heesom,et al.  Trends of 4D CAD applications for construction planning , 2004 .

[10]  Nashwan Dawood,et al.  A 4D planning tool: Automatic generation of progress and cost profiles using variable productivity data in earthwork construction , 2009 .

[11]  John Bennett,et al.  Simulation applied to construction projects , 1984 .

[12]  Laurence Smith,et al.  Refining the use of Monte Carlo techniques for risk analysis in project planning , 1999 .

[13]  Azlan Shah Ali,et al.  Cost performance for building construction projects in Klang Valley , 2010 .

[14]  Srinath Perera,et al.  Cost Studies of Buildings , 2004 .

[15]  Young Hoon Kwak,et al.  Exploring Monte Carlo Simulation Applications for Project Management , 2007 .

[16]  Heng Li,et al.  A 4D automatic simulation tool for construction resource planning: A case study , 2015 .

[17]  Akintola Akintoye,et al.  A survey of current cost estimating practices in the UK , 2000 .

[18]  R. V. Krejcie,et al.  Determining Sample Size for Research Activities , 1970 .

[19]  Sung Hoon An,et al.  Comparison of construction cost estimating models based on regression analysis, neural networks, and case-based reasoning , 2004 .

[20]  Bonsang Koo,et al.  Feasibility study of 4D CAD in commercial construction , 2002 .

[21]  S. Naoum Dissertation Research and Writing for Construction Students , 1997 .

[22]  Ali Touran,et al.  Monte Carlo Technique with Correlated Random Variables , 1992 .

[23]  Pavlos Loizou,et al.  Risk and uncertainty in development: A critical evaluation of using the Monte Carlo simulation method as a decision tool in real estate development projects , 2012 .

[24]  Jakob Beetz,et al.  Qualitative and quantitative cost estimation : a methodology analysis , 2014 .

[25]  C. R. Kothari,et al.  Research Methodology: Methods and Techniques , 2009 .

[26]  Eric S. Norman,et al.  Work Breakdown Structures: The Foundation for Project Management Excellence , 2008 .

[27]  David A Wood Risk Simulation Techniques to Aid Project Cost-Time Planning and Management , 2002 .

[28]  John N. Tsitsiklis,et al.  Introduction to Probability , 2002 .

[29]  Simaan M. AbouRizk,et al.  Role of Simulation in Construction Engineering and Management , 2010 .

[30]  Ismail Abdul Rahman,et al.  Time and Cost Performance in Construction Projects in Southern and Central Regions of Peninsular Malaysia , 2012 .

[31]  Tillal Eldabi,et al.  Simulation in manufacturing and business: A review , 2010, Eur. J. Oper. Res..