Investment Countermeasures and Control on Constructing an Economical Metro in Shenyang

Research purposes: Aimed at building an economical metro with good quality in Shenyang, the pape deeply analyzed and discussed the saving investment countermeasures at decision-making stage and the investment contol measures at implementation stage. And the paper drew useful conclusions in order to be references for debasing the metro cost in our country. Research methods:By comparing the metro projects in Shenyang with the built metro projects in other cities, the paper compared, analyzed and demonstrated the investment decision-making and control. Research results:According to the economical level in our country nowadays, it was economical and suitable that the unit cost per kilometer of the economical metro should be controlled under 450 million RMB. Research conclusions:It should be effective measures to fully prepare the studying and planning work, enhance the program and control of land, adopt domestic equipments, design within quota, enhance the whole process management of the metro projects.