Increasing productivity in ETO construction projects through a lean methodology for demand predictability
暂无分享,去创建一个
Erwin Rauch | Patrick Dallasega | Dominik T. Matt | Andrea Fronk | E. Rauch | P. Dallasega | D. Matt | Andrea Fronk
[1] P ? ? ? ? ? ? ? % ? ? ? ? , 1991 .
[2] Iris D. Tommelein,et al. DE-COUPLING CLADDING INSTALLATION FROM OTHER HIGH-RISE BUILDING TRADES: A CASE STUDY , 2001 .
[3] G. G. Stokes. "J." , 1890, The New Yale Book of Quotations.
[4] S. Keoki. Sears,et al. Construction Project Management , 1972 .
[5] Willibald A. Günthner,et al. Construction Scheduling and Resource Allocation Based on Actual State Data , 2013 .
[6] John Allen,et al. Lean Manufacturing: A Plant Floor Guide , 2001 .
[7] Roberto Arbulu. Application of PULL and CONWIP in Construction Production Systems , 2006 .
[8] Mohamed Al-Hussein,et al. Integrating 3D visualization and simulation for tower crane operations on construction sites , 2006 .
[9] Mohamed Al-Hussein,et al. Advanced simulation of tower crane operation utilizing system dynamics modeling and lean principles , 2010, WSC '10.
[10] Willibald A. Günthner,et al. Resource Allocation in Construction Scheduling based on Multi-Agent Negotiation , 2012 .
[11] Patrick Dallasega,et al. Design of the Building Execution Process in SME Construction Networks , 2013 .
[13] Daisuke Hirotani,et al. Comparing CONWIP, synchronized CONWIP, and Kanban in complex supply chains , 2005 .
[14] Ahmed Senouci,et al. Genetic algorithm-based multi-objective model for scheduling of linear construction projects , 2008, Adv. Eng. Softw..
[15] Iris D. Tommelein,et al. Development of an Integrated Facade System to Improve the High-Rise Building Process , 2009 .
[16] David L. Woodruff,et al. CONWIP: a pull alternative to kanban , 1990 .
[17] Olli Seppänen,et al. Location-Based Management for Construction: Planning, scheduling and control , 2006 .
[18] Iris D. Tommelein,et al. PARADE GAME :I MPACT OF WORK FLOW VARIABILITY ON TRADE PERFORMANCE , 1999 .
[19] Arthur W T Leung. SCHEDULING FOR HIGH-RISE BUILDING CONSTRUCTION USING SIMULATION TECHNIQUES , 2003 .
[20] Luis Felipe Romero Dessens,et al. Use of Value Mapping Tools for Manufacturing Systems Redesign , 2012 .
[21] Wallace J. Hopp,et al. To Pull or Not to Pull: What Is the Question? , 2004, Manuf. Serv. Oper. Manag..
[22] Erwin Rauch,et al. Synchronization of the Manufacturing Process and On-site Installation in ETO Companies , 2014 .
[23] H. Ping Tserng,et al. Developing a resource supply chain planning system for construction projects , 2006 .
[24] Li-Ren Yang. Key practices, manufacturing capability and attainment of manufacturing goals: The perspective of project/engineer-to-order manufacturing , 2013 .
[25] T LeungAW,et al. Scheduling for high-rise building construction using simulation techniques , 2003 .
[26] Iris D. Tommelein,et al. Pull-Driven Scheduling for Pipe-Spool Installation: Simulation of Lean Construction Technique , 1998 .