Criticality measurement in fuzzy project scheduling

Critical path method provides complete time analysis of project activities and identifies the critical ones based on deterministic time and cost estimates. In real-life, duration estimate of projec...

[1]  Hira N. Ahuja,et al.  Simulation Model to Forecast Project Completion Time , 1985 .

[2]  Marco Savoia,et al.  Fuzzy number theory to obtain conservative results with respect to probability , 1998 .

[3]  Pawel Zielinski,et al.  Critical path analysis in the network with fuzzy activity times , 2001, Fuzzy Sets Syst..

[4]  Osama Moselhi,et al.  Project-network analysis using fuzzy sets theory , 1996 .

[5]  Didier Dubois,et al.  On the sure criticality of tasks in activity networks with imprecise durations , 2002, IEEE Trans. Syst. Man Cybern. Part B.

[6]  Marcello Braglia,et al.  A fuzzy multi-criteria approach for critical path definition , 2009 .

[8]  Timothy J. Ross,et al.  Fuzzy Logic with Engineering Applications: Ross/Fuzzy Logic with Engineering Applications , 2010 .

[9]  Shih-Pin Chen,et al.  Analysis of critical paths in a project network with fuzzy activity times , 2007, Eur. J. Oper. Res..

[10]  K. Ganesan,et al.  PROJECT SCHEDULING PROBLEMS UNDER FUZZY ENVIRONMENT: A NEW SOLUTION APPROACH , 2014 .

[11]  David G. Woodward,et al.  Life cycle costing—Theory, information acquisition and application , 1997 .

[12]  Chen-Tung Chen,et al.  Applying fuzzy method for measuring criticality in project network , 2007, Inf. Sci..

[13]  L. Zadeh Discussion: probability theory and fuzzy logic are complementary rather than competitive , 1995 .

[14]  S. Chanas,et al.  THE USE OF FUZZY VARIABLES IN PERT , 1981 .

[15]  Jing Liu,et al.  Formalizing a path-float-based approach to determine and interpret total float in project scheduling analysis , 2017 .

[16]  Matthew J. Liberatore A Counterexample to the Forward Recursion in Fuzzy Critical Path Analysis Under Discrete Fuzzy Sets , 2016, ArXiv.

[17]  Paul Bowen,et al.  Practices, barriers and benefits of risk management process in building services costs estimation: comment , 1998 .

[18]  Fabian C. Hadipriono,et al.  Nondeterministic Networking Methods , 1993 .