미얀마 500㎸ 송전망 기본설계
暂无分享,去创建一个
KEPCO conducted the project called the "Feasibility Study & Basic Designs for the 500㎸ Transmission System in Myanmar" as its second overseas project following the "Development Study on the Power System Network Analysis in Myanmar" as its first project. This paper deals with the design processes and results of 423 kilometers of the 500㎸ single circuit transmission lines and three substations. The main contents of the basic design include insulation design, transmission line design and substation design.