Risk Assessment of Railway Transportation Systems using Timed Fault Trees

Safety is an essential requirement for railway transportation. There are many methods that have been developed to predict, prevent, and mitigate accidents in this context. All of these methods have their own purpose and limitations. This paper presents a new useful analysis technique: timed fault tree analysis. This method extends traditional fault tree analysis with temporal events and fault characteristics. Timed fault trees (TFTs) can determine which faults need to be eliminated urgently, and it can also provide how much time have been left at least to eliminate the root failure to prevent accidents. They can also be used to determine the time taken for railway maintenance requirements, and thereby improve maintenance efficiency, and reduce risks. In this paper, we present the features and functionality of a railway transportation system, and principles and rules of TFTs. We demonstrate the applicability of our framework by a case study on a simple railway transportation system. Copyright © 2014 John Wiley & Sons, Ltd.

[1]  Sunan Huang,et al.  Railway risk assessment - the fuzzy reasoning approach and fuzzy analytic hierarchy process approaches: A case study of shunting at Waterloo depot , 2007 .

[2]  W. E. Vesely,et al.  A time-dependent methodology for fault tree evaluation , 1970 .

[3]  Hong-Zhong Huang,et al.  Posbist fault tree analysis of coherent systems , 2004, Reliab. Eng. Syst. Saf..

[4]  Jan Magott,et al.  Timing analysis of safety properties using fault trees with time dependencies and timed state-charts , 2012, Reliab. Eng. Syst. Saf..

[5]  V. R. Renjith,et al.  Two-dimensional fuzzy fault tree analysis for chlorine release from a chlor-alkali industry using expert elicitation. , 2010, Journal of hazardous materials.

[6]  Florin Popentiu Reliability engineering handbook volume 2: Author: Dimitri Kececioglu Publisher: Prentice Hall, Inc. A division of Simon & Schuster Englewood Cliffs, New Jersey 07632 xxvii + 541 pages, Includes biografical references and index, February 1991 Price: $70.50 (ISBN 0-13-772302-4) , 1993 .

[7]  Jean-Jacques Lesage,et al.  Probabilistic Algebraic Analysis of Fault Trees With Priority Dynamic Gates and Repeated Events , 2010, IEEE Transactions on Reliability.

[8]  Salvatore J. Bavuso,et al.  Dynamic fault-tree models for fault-tolerant computer systems , 1992 .

[9]  Girish Keshav Palshikar Temporal fault trees , 2002, Inf. Softw. Technol..

[10]  Jan Magott,et al.  A Method of Analysis of Fault Trees with Time Dependencies , 2000, SAFECOMP.

[11]  Tongdan Jin,et al.  MULTIPLE FAILURE MODES ANALYSIS AND WEIGHTED RISK PRIORITY NUMBER EVALUATION IN FMEA , 2011 .

[12]  Jan Magott,et al.  Method of time Petri net analysis for analysis of fault trees with time dependencies , 2002 .

[13]  B. S. Mastryukov,et al.  Using the fault-tree method to analyze possible causes of accidents in the casting-rolling complex at OMK-Steel in Vyksa , 2011 .

[14]  Peter J. Haas,et al.  Stochastic Petri Nets , 2002 .

[15]  Borut Mavko,et al.  Application of the fault tree analysis for assessment of power system reliability , 2009, Reliab. Eng. Syst. Saf..

[16]  Peter J. Haas,et al.  Stochastic Petri Nets: Modelling, Stability, Simulation , 2002 .

[17]  Y-T Tsai,et al.  Applying a case-based reasoning method for fault diagnosis during maintenance , 2009 .

[18]  Suguo Du,et al.  New Progressive Variable Ordering for Binary Decision Diagram Analysis of Fault Trees , 2005 .

[19]  Huawen Liu,et al.  Efficient Ordering Heuristics in Binary Decision Diagram-based Fault Tree Analysis , 2013, Qual. Reliab. Eng. Int..

[20]  Faisal Khan,et al.  Risk Assessment and Safety Evaluation Using Probabilistic Fault Tree Analysis , 2001 .

[21]  Clifton A. Ericson,et al.  Hazard Analysis Techniques for System Safety , 2005 .

[22]  Rasa Remenyte-Prescott,et al.  An efficient real-time method of analysis for non-coherent fault trees , 2009, Qual. Reliab. Eng. Int..

[23]  Ehsan Jafarian,et al.  Application of fuzzy fault tree analysis for evaluation of railway safety risks: an evaluation of root causes for passenger train derailment , 2012 .

[24]  Makis Stamatelatos,et al.  Fault tree handbook with aerospace applications , 2002 .

[25]  Hong-Zhong Huang,et al.  A New Ordering Method of Basic Events in Fault Tree Analysis , 2012, Qual. Reliab. Eng. Int..

[26]  Min Xie,et al.  Quantitative risk assessment through hybrid causal logic approach , 2011 .

[27]  Clifton A. Ericson,et al.  Hazard Analysis Techniques for System Safety: Ericson/Hazard Analysis Techniques for System Safety , 2005 .

[28]  O Borgia,et al.  Risk-based inspections enhanced with Bayesian networks , 2011 .

[29]  Yves Dutuit,et al.  Probabilistic assessments in relationship with safety integrity levels by using Fault Trees , 2008, Reliab. Eng. Syst. Saf..

[30]  John D. Andrews,et al.  Dependability analysis of systems with on-demand and active failure modes, using dynamic fault trees , 2002, IEEE Trans. Reliab..