Multilayered Pipe Cutting Test for Remote Handling Maintenance
暂无分享,去创建一个
[1] Yunlong Chi,et al. China Spallation Neutron Source: Design, R&D, and outlook , 2009 .
[2] P ? ? ? ? ? ? ? % ? ? ? ? , 1991 .
[3] L. Galbiati,et al. A report on the first remote handling operations at JET , 1999 .
[4] M. Medrano,et al. Feasibility study of the cut and weld operations by RH on the cooling pipes of ITER NB components , 2009 .
[5] P. Pani,et al. GEMS: Underwater spectrometer for long-term radioactivity measurements , 2011 .
[6] Bernhard Haist. Setting up and managing a remote maintenance operation for fusion , 2008 .
[7] Minghan Ye,et al. BEPC, the Beijing electron-positron collider , 1988 .
[8] Mikko Siuko,et al. The remote handling systems for ITER , 2011 .
[9] G. S. Bauer,et al. Physics and technology of spallation neutron sources , 2001 .
[10] T. Virdee,et al. The LHC project: The accelerator and the experiments , 2010 .
[11] N. Holtkamp,et al. An overview of the ITER project , 2007 .
[12] Robin Shuff,et al. A Study of Pipe Jointing Technology with Reference to ITER Requirements , 2009 .