Analysis of supply system models for planning construction project logistics

Abstract The paper discusses a number of construction project logistics problems, with focus on supply systems, and presents the results of recent survey of Polish contractors’ supply routines. On the basis of the survey, patterns of development of logistic systems have been described. The enclosed results of cost simulations indicate that outsourcing supply logistic processes, considering the current state of Polish construction market, may reduce costs. The paper emphasises that creating logistic guidelines of a project at its early stages of planning and then a design of integrated logistic service to the project may help find ways of making a construction project more effective.

[1]  Andrzej Buszko Zmiany w logistyce dostaw materiałów dla wykonawczych firm budowlanych w latach 1992-2002 , 2003 .

[2]  A. Sobotka Identifying logistic system models in construction companies , 2001 .

[3]  Hans Voordijk The changing logistical system of the building materials supply chain , 2000 .

[4]  G. Stevens Integrating the Supply Chain , 1989 .

[5]  M. Perona,et al.  A new framework for supply chain management , 2013 .

[6]  Pietro Romano,et al.  Supply chain management: an analytical framework for critical literature review , 2000 .

[7]  Lauri Koskela,et al.  The four roles of supply chain management in construction , 2000 .

[8]  A. Sobotka,et al.  Logistics of construction projects , 2005 .

[9]  S. Rowlinson,et al.  Quality relationships: partnering in the construction supply chain , 2000 .

[10]  Mohamed Mohamed Naim,et al.  Re‐engineering a construction supply chain: a material flow control approach , 2003 .

[11]  Hans Voordijk,et al.  Preconditions and dynamics of logistics networks in the Dutch building industry , 1999 .

[12]  Anna Sobotka Simulation modelling for logistics re-engineering in the construction company , 2000 .

[13]  Z. Irani,et al.  An e‐business model to support supply chain activities in construction , 2001 .

[14]  Gerald J. Thuesen,et al.  TEACHING AND RESEARCH IN ENGINEERING ECONOMY , 1984 .

[15]  Ekambaram Palaneeswaran,et al.  Selection matters – in construction supply chain optimisation , 2000 .

[16]  Peter E.D. Love,et al.  A seamless supply chain management model for construction , 2004 .

[17]  J. Holmström,et al.  Managing the Demand-Supply Chain: Value Innovations for Customer Satisfaction , 2001 .

[18]  Er Evert Poortman,et al.  Information for the management of the building‐materials flow , 1994 .

[19]  Low Sui Pheng,et al.  Just-in-Time Management of Precast Concrete Components , 2001 .