Analysis of supply system models for planning construction project logistics
暂无分享,去创建一个
[1] Andrzej Buszko. Zmiany w logistyce dostaw materiałów dla wykonawczych firm budowlanych w latach 1992-2002 , 2003 .
[2] A. Sobotka. Identifying logistic system models in construction companies , 2001 .
[3] Hans Voordijk. The changing logistical system of the building materials supply chain , 2000 .
[4] G. Stevens. Integrating the Supply Chain , 1989 .
[5] M. Perona,et al. A new framework for supply chain management , 2013 .
[6] Pietro Romano,et al. Supply chain management: an analytical framework for critical literature review , 2000 .
[7] Lauri Koskela,et al. The four roles of supply chain management in construction , 2000 .
[8] A. Sobotka,et al. Logistics of construction projects , 2005 .
[9] S. Rowlinson,et al. Quality relationships: partnering in the construction supply chain , 2000 .
[10] Mohamed Mohamed Naim,et al. Re‐engineering a construction supply chain: a material flow control approach , 2003 .
[11] Hans Voordijk,et al. Preconditions and dynamics of logistics networks in the Dutch building industry , 1999 .
[12] Anna Sobotka. Simulation modelling for logistics re-engineering in the construction company , 2000 .
[13] Z. Irani,et al. An e‐business model to support supply chain activities in construction , 2001 .
[14] Gerald J. Thuesen,et al. TEACHING AND RESEARCH IN ENGINEERING ECONOMY , 1984 .
[15] Ekambaram Palaneeswaran,et al. Selection matters – in construction supply chain optimisation , 2000 .
[16] Peter E.D. Love,et al. A seamless supply chain management model for construction , 2004 .
[17] J. Holmström,et al. Managing the Demand-Supply Chain: Value Innovations for Customer Satisfaction , 2001 .
[18] Er Evert Poortman,et al. Information for the management of the building‐materials flow , 1994 .
[19] Low Sui Pheng,et al. Just-in-Time Management of Precast Concrete Components , 2001 .