Analysis of Factors Influencing Productivity Using Craftsmen Questionnaires: Case Study in a Chilean Construction Company
暂无分享,去创建一个
Luis F. Alarcón | John D. Borcherding | Rodrigo A. Rivas | Vicente González | Rodrigo A. Rivas | L. Alarcón | J. Borcherding | V. Gonzalez
[1] Paul M. Goodrum,et al. Construction Craft Workers’ Perceptions of the Factors Affecting Their Productivity , 2009 .
[2] Murat Gunduz. A quantitative approach for evaluation of negative impact of overmanning on electrical and mechanical projects , 2004 .
[3] Eddy M. Rojas,et al. Labor Productivity Drivers and Opportunities in the Construction Industry , 2003 .
[4] John D. Borcherding,et al. Factors influencing the motivation and productivity of craftsmen and foremen on large construction projects , 1979 .
[5] Abang Abdullah Abang Ali,et al. Factors affecting construction labour productivity for Malaysian residential projects , 2005 .
[6] David R. Riley,et al. Loss of Labor Productivity due to Delivery Methods and Weather , 1999 .
[7] Awad S. Hanna,et al. The impact of change orders on mechanical construction labour efficiency , 1999 .
[8] Luis F. Alarcón,et al. Benchmarking System for Evaluating Management Practices in the Construction Industry , 2004 .
[9] Awad S. Hanna,et al. Impact of Shift Work on Labor Productivity for Labor Intensive Contractor , 2008 .
[10] Glenn Ballard,et al. Improving Labor Productivity Through Production Control , 2008 .
[11] Luis F. Alarcón,et al. Assessing the Impacts of Implementing Lean Construction , 2008 .
[12] Sunil K. Sinha,et al. Fundamental Principles for Avoiding Congested Work Areas—A Case Study , 2006 .
[13] Luis F. Alarcón,et al. Implementing Lean Production Strategies in Construction Companies , 2003 .
[14] Awad S. Hanna,et al. Impact of extended overtime on construction labor productivity , 2005 .
[15] James E. Rowings,et al. Construction Labor Productivity Modeling with Neural Networks , 1998 .
[16] David W. Halligan,et al. Action-Response Model and Loss of Productivity in Construction , 1994 .
[17] R. Yin. Case Study Research: Design and Methods , 1984 .
[18] Luis F. Alarcón,et al. Investigating the relationship between planning reliability and project performance , 2007 .
[19] William Ibbs,et al. Impact of Change's Timing on Labor Productivity , 2005 .
[20] John Christian,et al. Effects of Delay Times on Production Rates in Construction , 1995 .
[21] Awad S. Hanna,et al. Impact of Overmanning on Mechanical and Sheet Metal Labor Productivity , 2007 .