Analysis of Factors Influencing Productivity Using Craftsmen Questionnaires: Case Study in a Chilean Construction Company

Improvement of productivity in construction has been a major industry challenge, given its high impact on project results. It has received increased attention from construction researchers promoting different enhancement actions, since analyzing factors affecting labor productivity is an instrumental part in this process. This paper focuses on identifying and understanding the productivity factors affecting projects in a Chilean construction company on the basis of questionnaires administered to both direct workers and midlevel employees. Analysis of the questionnaire results helped to determine organizational and managerial weaknesses and facilitated comparison of the findings with previous productivity studies. The results proved to be useful in developing recommendations for productivity improvements. The main findings indicate that the critical areas affecting construction productivity were related to materials, tools, rework, equipment, truck availability, and the workers' motivational dynamics. These results are similar to those obtained in previous studies in the United States and in Chile. Salary expectations were found to be the main reason for turnover in the studied company, which was an aspect not mentioned in previous studies. Finally, additional analyses seem to show that some factors affecting productivity are common to construction projects across boundaries, therefore validating data aggregation and the possibility of learning from experiences in different locations and even separated in time of occurrence.

[1]  Paul M. Goodrum,et al.  Construction Craft Workers’ Perceptions of the Factors Affecting Their Productivity , 2009 .

[2]  Murat Gunduz A quantitative approach for evaluation of negative impact of overmanning on electrical and mechanical projects , 2004 .

[3]  Eddy M. Rojas,et al.  Labor Productivity Drivers and Opportunities in the Construction Industry , 2003 .

[4]  John D. Borcherding,et al.  Factors influencing the motivation and productivity of craftsmen and foremen on large construction projects , 1979 .

[5]  Abang Abdullah Abang Ali,et al.  Factors affecting construction labour productivity for Malaysian residential projects , 2005 .

[6]  David R. Riley,et al.  Loss of Labor Productivity due to Delivery Methods and Weather , 1999 .

[7]  Awad S. Hanna,et al.  The impact of change orders on mechanical construction labour efficiency , 1999 .

[8]  Luis F. Alarcón,et al.  Benchmarking System for Evaluating Management Practices in the Construction Industry , 2004 .

[9]  Awad S. Hanna,et al.  Impact of Shift Work on Labor Productivity for Labor Intensive Contractor , 2008 .

[10]  Glenn Ballard,et al.  Improving Labor Productivity Through Production Control , 2008 .

[11]  Luis F. Alarcón,et al.  Assessing the Impacts of Implementing Lean Construction , 2008 .

[12]  Sunil K. Sinha,et al.  Fundamental Principles for Avoiding Congested Work Areas—A Case Study , 2006 .

[13]  Luis F. Alarcón,et al.  Implementing Lean Production Strategies in Construction Companies , 2003 .

[14]  Awad S. Hanna,et al.  Impact of extended overtime on construction labor productivity , 2005 .

[15]  James E. Rowings,et al.  Construction Labor Productivity Modeling with Neural Networks , 1998 .

[16]  David W. Halligan,et al.  Action-Response Model and Loss of Productivity in Construction , 1994 .

[17]  R. Yin Case Study Research: Design and Methods , 1984 .

[18]  Luis F. Alarcón,et al.  Investigating the relationship between planning reliability and project performance , 2007 .

[19]  William Ibbs,et al.  Impact of Change's Timing on Labor Productivity , 2005 .

[20]  John Christian,et al.  Effects of Delay Times on Production Rates in Construction , 1995 .

[21]  Awad S. Hanna,et al.  Impact of Overmanning on Mechanical and Sheet Metal Labor Productivity , 2007 .