Abstract Prequalification of the Double Split Tee (DST) connection has been conducted using hot-rolled shapes, whose availability is still limited in several countries. In addition, the range of available T web and flange thicknesses is narrow for these shapes. Thus, the use of built-up T-stubs on the DST connection seems to be a promising alternative, considering that they offer more freedom of sizing and allow a better use of the material. The experimental research reported here aimed to validate the use of built-up tees instead of hot rolled tees in DST moment connections. Four beam-to-column full-scale double built-up T (DBT) moment connections were subjected to cyclic loading following the prescribed loading history in AISC seismic provisions. The parameters varied among the specimens were the T flange thickness, the type of weld between the T flange and the stem (fillet weld or full penetration groove weld), and the column web thickness, in order to observe the most significant limit states of the connection, namely development of plastic hinges in beams, panel zone plastification, and T flange prying. The results indicate that the connection can sustain 4% drift without strength degradation, whether it is designed for T flange prying or beam hinging. In the case of the former, only limited permanent deformation of the flange is observed, while for the latter significant plastic deformation of the beam can be achieved with little or no damage of the T. The type of weld used has no significant effect on the connection performance.
[1]
James A. Swanson,et al.
BOLTED STEEL CONNECTIONS: TESTS ON T-STUB COMPONENTS
,
2000
.
[2]
Luís Simões da Silva,et al.
Experimental assessment of the behaviour of bolted T-stub connections made up of welded plates
,
2004
.
[3]
James A. Swanson,et al.
Built-up T-Stub connections for special and intermediate moment frames. Numerical and experimental testing for prequalification
,
2009
.
[4]
Miguel Bravo,et al.
Performance under cyclic load of built-up T-stubs for Double T moment connections
,
2014
.
[5]
Jeffrey M. Smallidge.
Behavior of bolted beam-to-column T-stub connections under cyclic loading
,
1999
.
[6]
Vincenzo Piluso,et al.
ULTIMATE BEHAVIOR OF BOLTED T-STUBS. II: MODEL VALIDATION
,
2001
.
[7]
W. J. Hall,et al.
Recommended Seismic Design Criteria for New Steel Moment-Frame Buildings
,
2001
.
[8]
Ronald O. Hamburger,et al.
Prequalified Connections for Special and Intermediate Steel Moment Frames for Seismic Applications, ANSI/AISC 358-05
,
2006
.
[9]
Miguel Bravo,et al.
Performance of built-up T-stubs for Double T moment connections
,
2013
.