Product Remanufacturing: A Real Options Approach
暂无分享,去创建一个
[1] Wenbo Shi,et al. A Study of Product Weight and Collection Rate in Closed-Loop Supply Chains With Recycling , 2013, IEEE Transactions on Engineering Management.
[2] Meng-Hua Ye. Optimal replacement policy with stochastic maintenance and operation costs , 1990 .
[3] Mark Ferguson,et al. The Value of Quality Grading in Remanufacturing , 2009 .
[4] Harriet Black Nembhard,et al. Real options in engineering design, operations, and management , 2009 .
[5] T. Cooper. Slower Consumption Reflections on Product Life Spans and the “Throwaway Society” , 2005 .
[6] Luk N. Van Wassenhove,et al. Closed - Loop Supply Chain Models with Product Remanufacturing , 2004, Manag. Sci..
[7] Robert T. Lund,et al. Remanufacturing : the experience of the United States and implications for developing countries , 1985 .
[8] Richard de Neufville,et al. Flexibility in Engineering Design , 2011 .
[9] Michael R. Galbreth,et al. Optimal Acquisition Quantities in Remanufacturing with Condition Uncertainty , 2010 .
[10] Michael R. Galbreth,et al. Optimal Acquisition and Sorting Policies for Remanufacturing , 2006 .
[11] S. Suslick,et al. Estimating the volatility of mining projects considering price and operating cost uncertainties , 2006 .
[12] V. Guide. Production planning and control for remanufacturing: industry practice and research needs , 2000 .
[13] G. De Sensi,et al. Inventory policies analysis under demand patterns and lead times constraints in a real supply chain , 2008 .
[14] D. Lund,et al. How to analyze the investment–uncertainty relationship in real option models? , 2005 .
[15] Randall W. Jackson,et al. Constructing a Baseline Input-Output Model with Environmental Accounts (IOEA) , 2009 .
[16] Gilvan C. Souza. Production Planning and Control for Remanufacturing , 2010 .
[17] S. Ryan,et al. Capacity expansion under a service‐level constraint for uncertain demand with lead times , 2009 .
[18] J. Meyer. Equipment Replacement Under Uncertainty , 1971 .
[19] Francisco D. Galiana,et al. Reconciling social welfare, agent profits, and consumer payments in electricity pools , 2003 .
[20] Quinn Weninger,et al. Firm Dynamics with Tradable Output Permits , 2002 .
[21] Dean Paxson,et al. Reciprocal Energy-switching Options , 2011 .
[22] Lei Zhu. A simulation based real options approach for the investment evaluation of nuclear power , 2012, Comput. Ind. Eng..
[23] Daniel D. Frey,et al. Empirical evaluation of procedures to generate flexibility in engineering systems and improve lifecycle performance , 2013 .
[24] Luk N. Van Wassenhove,et al. The Economics of Remanufacturing Under Limited Component Durability and Finite Product Life Cycles , 2007, Manag. Sci..
[25] João Zambujal-Oliveira,et al. Operational asset replacement strategy: A real options approach , 2011, Eur. J. Oper. Res..
[26] Paulo Picchetti,et al. Geometric Brownian Motion and structural breaks in oil prices: A quantitative analysis , 2006 .
[27] Dean Paxson,et al. Renewing Assets with Uncertain Revenues and Operating Costs , 2011 .
[28] Daniel E. Hastings,et al. Real Options in Enterprise Architecture: A Holistic Mapping of Mechanisms and Types for Uncertainty Management , 2011, IEEE Transactions on Engineering Management.
[29] Reinhard Madlener,et al. Optimal technology choice and investment timing: A stochastic model of industrial cogeneration vs. heat-only production , 2007 .
[30] Chris Ryan,et al. Eco-efficiency gains from remanufacturing: A case study of photocopier remanufacturing at Fuji Xerox Australia , 2001 .
[31] P. Swan. Durability of Consumption Goods , 1970 .
[32] Vedat Verter,et al. Investing in reusability of products of uncertain remanufacturing cost: The role of inspection capabilities , 2012 .
[33] Chung-Hsiao Wang,et al. An Exit and Entry Study of Renewable Power Producers: A Real Options Approach , 2012 .
[34] Patrick Beullens,et al. Closed-loop supply chain network equilibrium under legislation , 2007, Eur. J. Oper. Res..
[35] Gilvan C. Souza,et al. Multiperiod Remanufacturing Planning With Uncertain Quality of Inputs , 2010, IEEE Transactions on Engineering Management.
[36] Chris Marnay,et al. Distributed Generation Investment by a Microgrid under Uncertainty , 2006 .
[37] Tamer Boyacı,et al. The effect of categorizing returned products in remanufacturing , 2004 .
[38] H. Wee,et al. Green-component life-cycle value on design and reverse manufacturing in semi-closed supply chain , 2008 .
[39] H. Kaebernick,et al. Remaining life estimation of used components in consumer products: Life cycle data analysis by Weibull and artificial neural networks , 2007 .
[40] Simme Douwe Flapper,et al. Product recovery in stochastic remanufacturing systems with multiple reuse options , 2001, Eur. J. Oper. Res..
[41] Ruey Huei Yeh,et al. OPTIMAL PREVENTIVE-MAINTENANCE WARRANTY POLICIES FOR REPAIRABLE PRODUCTS WITH AGE-DEPENDENT MAINTENANCE COSTS , 2005 .