Applying the analytic network process for risk assessment in sustainable ground improvement
暂无分享,去创建一个
[1] Wen-Hsien Tsai,et al. Selecting management systems for sustainable development in SMEs: A novel hybrid model based on DEMATEL, ANP, and ZOGP , 2009, Expert Syst. Appl..
[2] Ali Jaafari,et al. Management of risks, uncertainties and opportunities on projects: time for a fundamental shift , 2001 .
[3] Denis F. Cioffi,et al. A practical method of determining project risk contingency budgets , 2009, J. Oper. Res. Soc..
[4] Dubravka Bjegović,et al. Soil improvement with nano waste particles , 2008 .
[5] Beliz Ozorhon,et al. Project appraisal and selection using the analytic network process , 2007 .
[6] Elena Comino,et al. Application of the Analytic Hierarchy Process and the Analytic Network Process for the assessment of different wastewater treatment systems , 2011, Environ. Model. Softw..
[7] A. Ceri,et al. Odre đ ivanje prvenstva pri upravljanju rizicima gra đ evinskih projekata , 2011 .
[8] Guangtao Fu,et al. Multiple objective optimal control of integrated urban wastewater systems , 2008, Environ. Model. Softw..
[9] Gang Kou,et al. Analytic network process in risk assessment and decision analysis , 2014, Comput. Oper. Res..
[10] Anita Cerić,et al. A risk-assessment methodology in tunneling , 2011 .
[11] Hua Jiang,et al. Investment Risks Assessment on High-tech Projects Based on Analytic Hierarchy Process and BP Neural Network , 2010, J. Networks.
[12] T. Saaty. The Analytic Network Process , 2001 .
[13] Anita Cerić,et al. Determining priorities for managing risk on construction projects , 2011 .
[14] Seyed Bagher Hosseini,et al. Risk assessment model selection in construction industry , 2011, Expert Syst. Appl..
[15] Kevin F. R. Liu,et al. Decision-support for environmental impact assessment: A hybrid approach using fuzzy logic and fuzzy analytic network process , 2009, Expert Syst. Appl..
[16] Thomas L. Saaty,et al. Time dependent decision-making; dynamic priorities in the AHP/ANP: Generalizing from points to functions and from real to complex variables , 2007, Math. Comput. Model..
[17] Jian-Bo Yang,et al. Construction Risk Modelling and Assessment: Insights from a Literature Review , 2011 .
[18] T. Saaty. Fundamentals of the analytic network process — Dependence and feedback in decision-making with a single network , 2004 .
[19] Anita Ceric. Investment into New Technology under Uncertainty Conditions , 2009 .
[20] M. Merz,et al. Estimation of industrial and commercial asset values for hazard risk assessment , 2010 .
[21] Thomas L. Saaty,et al. Rank from comparisons and from ratings in the analytic hierarchy/network processes , 2006, Eur. J. Oper. Res..
[22] Igor Linkov,et al. Weight-of-evidence evaluation in environmental assessment: review of qualitative and quantitative approaches. , 2009, The Science of the total environment.
[23] Robert M. Argent,et al. A new approach to water quality modelling and environmental decision support systems , 2009, Environ. Model. Softw..
[24] Patrick X.W. Zou,et al. Fuzzy AHP-Based Risk Assessment Methodology for PPP Projects , 2011 .
[25] H. Vacik,et al. Evaluating sustainable forest management strategies with the Analytic Network Process in a Pressure-State-Response framework. , 2008, Journal of environmental management.
[26] Jennifer Lyndall,et al. Terrestrial ecological risk evaluation for triclosan in land‐applied biosolids , 2010, Integrated environmental assessment and management.
[27] Ted W. Simon,et al. Derivation of Soil Clean-Up Levels for 2,3,7,8-Tetrachloro-dibenzo-p-dioxin (TCDD) Toxicity Equivalence (TEQD/F) in Soil Through Deterministic and Probabilistic Risk Assessment of Exposure and Toxicity , 2011 .
[28] Max John,et al. Design approach for the hybrid underground station at Union Suare/Market Street in San Francisco , 2009 .
[29] Zi Qi Tang,et al. A Case Library Creating Method Based on Risk Control of Tunnel Engineering , 2011 .
[30] Edmundas Kazimieras Zavadskas,et al. Risk assessment of construction projects , 2010 .
[31] Anita Cerić,et al. Upravljanje održavanjem zgrada , 2001 .
[32] S. Nazarian,et al. Quality Assessment and Quality Control of Deep Soil Mixing Construction for Stabilizing Expansive Subsoils , 2010 .
[33] Anita Cerić,et al. SELECTION OF A FIELD TESTING METHOD FOR KARST ROCK MASS DEFORMABILITY BY MULTI CRITERIA DECISION ANALYSIS , 2013 .
[34] G. Corder,et al. Costs and carbon emissions for geopolymer pastes in comparison to ordinary portland cement , 2011 .
[35] Zhi Chen,et al. Environmental risk assessment of offshore produced water discharges using a hybrid fuzzy-stochastic modeling approach , 2010, Environmental Modelling & Software.
[36] N. Roussel,et al. An environmental evaluation of geopolymer based concrete production: reviewing current research trends , 2011 .
[37] Huey-Jiun Wang,et al. A multi-objective decision-making process for reuse selection of historic buildings , 2010, Expert Syst. Appl..
[38] Irem Dikmen,et al. Risk assessment of international construction projects using the analytic network process , 2009 .
[39] Igor Linkov,et al. Sustainable Management of Water Resources and Minimization of Environmental Risks , 2008 .
[40] Valentina Ferretti,et al. Integrating the analytic network process (ANP) and the driving force‐pressure‐state‐impact‐ responses (DPSIR) model for the sustainability assessment of territorial transformations , 2010 .
[41] Kevin Fong-Rey Liu,et al. Integrating case-based and fuzzy reasoning to qualitatively predict risk in an environmental impact assessment review , 2009, Environ. Model. Softw..
[42] Keith W. Goyne,et al. Long-Term Risk Reduction of Lead-Contaminated Urban Soil by Phosphate Treatment , 2009 .