Applying the analytic network process for risk assessment in sustainable ground improvement

Temeljenje teskih građevina u mekom tlu može se rijesiti poboljsanjem tla. Održivo poboljsanje tla postiže se mijesanjem tla sa sintetiziranim vezivima - geopolimerima. Prirodno tlo se na taj nacin pretvara u novi materijal. U radu je prikazana primjena analitickog mrežnog procesa (ANP) za procjenu rizika u održivom poboljsanju tla. Analize osjetljivosti pokazale su izrazitu stabilnost rezultata odlucivanja.

[1]  Wen-Hsien Tsai,et al.  Selecting management systems for sustainable development in SMEs: A novel hybrid model based on DEMATEL, ANP, and ZOGP , 2009, Expert Syst. Appl..

[2]  Ali Jaafari,et al.  Management of risks, uncertainties and opportunities on projects: time for a fundamental shift , 2001 .

[3]  Denis F. Cioffi,et al.  A practical method of determining project risk contingency budgets , 2009, J. Oper. Res. Soc..

[4]  Dubravka Bjegović,et al.  Soil improvement with nano waste particles , 2008 .

[5]  Beliz Ozorhon,et al.  Project appraisal and selection using the analytic network process , 2007 .

[6]  Elena Comino,et al.  Application of the Analytic Hierarchy Process and the Analytic Network Process for the assessment of different wastewater treatment systems , 2011, Environ. Model. Softw..

[7]  A. Ceri,et al.  Odre đ ivanje prvenstva pri upravljanju rizicima gra đ evinskih projekata , 2011 .

[8]  Guangtao Fu,et al.  Multiple objective optimal control of integrated urban wastewater systems , 2008, Environ. Model. Softw..

[9]  Gang Kou,et al.  Analytic network process in risk assessment and decision analysis , 2014, Comput. Oper. Res..

[10]  Anita Cerić,et al.  A risk-assessment methodology in tunneling , 2011 .

[11]  Hua Jiang,et al.  Investment Risks Assessment on High-tech Projects Based on Analytic Hierarchy Process and BP Neural Network , 2010, J. Networks.

[12]  T. Saaty The Analytic Network Process , 2001 .

[13]  Anita Cerić,et al.  Determining priorities for managing risk on construction projects , 2011 .

[14]  Seyed Bagher Hosseini,et al.  Risk assessment model selection in construction industry , 2011, Expert Syst. Appl..

[15]  Kevin F. R. Liu,et al.  Decision-support for environmental impact assessment: A hybrid approach using fuzzy logic and fuzzy analytic network process , 2009, Expert Syst. Appl..

[16]  Thomas L. Saaty,et al.  Time dependent decision-making; dynamic priorities in the AHP/ANP: Generalizing from points to functions and from real to complex variables , 2007, Math. Comput. Model..

[17]  Jian-Bo Yang,et al.  Construction Risk Modelling and Assessment: Insights from a Literature Review , 2011 .

[18]  T. Saaty Fundamentals of the analytic network process — Dependence and feedback in decision-making with a single network , 2004 .

[19]  Anita Ceric Investment into New Technology under Uncertainty Conditions , 2009 .

[20]  M. Merz,et al.  Estimation of industrial and commercial asset values for hazard risk assessment , 2010 .

[21]  Thomas L. Saaty,et al.  Rank from comparisons and from ratings in the analytic hierarchy/network processes , 2006, Eur. J. Oper. Res..

[22]  Igor Linkov,et al.  Weight-of-evidence evaluation in environmental assessment: review of qualitative and quantitative approaches. , 2009, The Science of the total environment.

[23]  Robert M. Argent,et al.  A new approach to water quality modelling and environmental decision support systems , 2009, Environ. Model. Softw..

[24]  Patrick X.W. Zou,et al.  Fuzzy AHP-Based Risk Assessment Methodology for PPP Projects , 2011 .

[25]  H. Vacik,et al.  Evaluating sustainable forest management strategies with the Analytic Network Process in a Pressure-State-Response framework. , 2008, Journal of environmental management.

[26]  Jennifer Lyndall,et al.  Terrestrial ecological risk evaluation for triclosan in land‐applied biosolids , 2010, Integrated environmental assessment and management.

[27]  Ted W. Simon,et al.  Derivation of Soil Clean-Up Levels for 2,3,7,8-Tetrachloro-dibenzo-p-dioxin (TCDD) Toxicity Equivalence (TEQD/F) in Soil Through Deterministic and Probabilistic Risk Assessment of Exposure and Toxicity , 2011 .

[28]  Max John,et al.  Design approach for the hybrid underground station at Union Suare/Market Street in San Francisco , 2009 .

[29]  Zi Qi Tang,et al.  A Case Library Creating Method Based on Risk Control of Tunnel Engineering , 2011 .

[30]  Edmundas Kazimieras Zavadskas,et al.  Risk assessment of construction projects , 2010 .

[31]  Anita Cerić,et al.  Upravljanje održavanjem zgrada , 2001 .

[32]  S. Nazarian,et al.  Quality Assessment and Quality Control of Deep Soil Mixing Construction for Stabilizing Expansive Subsoils , 2010 .

[33]  Anita Cerić,et al.  SELECTION OF A FIELD TESTING METHOD FOR KARST ROCK MASS DEFORMABILITY BY MULTI CRITERIA DECISION ANALYSIS , 2013 .

[34]  G. Corder,et al.  Costs and carbon emissions for geopolymer pastes in comparison to ordinary portland cement , 2011 .

[35]  Zhi Chen,et al.  Environmental risk assessment of offshore produced water discharges using a hybrid fuzzy-stochastic modeling approach , 2010, Environmental Modelling & Software.

[36]  N. Roussel,et al.  An environmental evaluation of geopolymer based concrete production: reviewing current research trends , 2011 .

[37]  Huey-Jiun Wang,et al.  A multi-objective decision-making process for reuse selection of historic buildings , 2010, Expert Syst. Appl..

[38]  Irem Dikmen,et al.  Risk assessment of international construction projects using the analytic network process , 2009 .

[39]  Igor Linkov,et al.  Sustainable Management of Water Resources and Minimization of Environmental Risks , 2008 .

[40]  Valentina Ferretti,et al.  Integrating the analytic network process (ANP) and the driving force‐pressure‐state‐impact‐ responses (DPSIR) model for the sustainability assessment of territorial transformations , 2010 .

[41]  Kevin Fong-Rey Liu,et al.  Integrating case-based and fuzzy reasoning to qualitatively predict risk in an environmental impact assessment review , 2009, Environ. Model. Softw..

[42]  Keith W. Goyne,et al.  Long-Term Risk Reduction of Lead-Contaminated Urban Soil by Phosphate Treatment , 2009 .