Enhancement of rail track performance through utilisation of geosynthetic inclusions
暂无分享,去创建一个
[1] Dingqing Li,et al. Transition of Railroad Bridge Approaches , 2005 .
[2] Sanjay Nimbalkar,et al. The Behaviour of Ballasted Track Foundations: Track Drainage and Geosynthetic Reinforcement , 2010 .
[3] Nick Thom,et al. Discrete element modelling of cyclic loads of geogrid-reinforced ballast under confined and unconfined conditions , 2012 .
[4] B. Indraratna,et al. Effect of confining pressure on ballast degradation and deformation under cyclic triaxial loading , 2007 .
[5] Sanjay Nimbalkar,et al. The role of ballast fouling characteristics on the drainage capacity of rail substructure , 2012 .
[6] Buddhima Indraratna,et al. DEFORMATION AND DEGRADATION MECHANICS OF RECYCLED BALLAST STABILISED WITH GEOSYNTHETICS , 2003 .
[7] G. Raymond. Reinforced ballast behaviour subjected to repeated load , 2002 .
[8] D Lyon,et al. THE EFFECT OF TRACK AND VEHICLE PARAMETERS ON WHEEL/RAIL VERTICAL DYNAMIC FORCES , 1974 .
[9] M J Shenton. DEFORMATION OF RAILWAY BALLAST UNDER REPEATED LOADING CONDITIONS , 1975 .
[10] B. Indraratna,et al. Field Assessment of the Performance of a Ballasted Rail Track with and without Geosynthetics , 2010 .
[11] Sanjay Nimbalkar,et al. Stress-Strain Degradation Response of Railway Ballast Stabilized with Geosynthetics , 2013 .
[12] Richard J. Bathurst,et al. GEOGRID REINFORCEMENT OF BALLASTED TRACK , 1987 .
[13] Sanjay Nimbalkar,et al. Improved Performance of Railway Ballast under Impact Loads Using Shock Mats , 2012 .
[14] Braja M. Das,et al. Geogrid-reinforced railroad bed settlement due to cyclic load , 2002 .
[15] A. López-Pita,et al. Numerical Modeling of High-Speed Train/Track System to Assess Track Vibrations and Settlement Prediction , 2013 .
[16] Nayoma C Tennakoon. Geotechnical study of engineering behaviour of fouled ballast , 2012 .
[17] Bhanitiz Aursudkij,et al. A Laboratory Study of Railway Ballast Behaviour: Under Traffic Loading and Tamping Maintenance , 2009 .
[18] B. Indraratna,et al. Advanced Rail Geotechnology – Ballasted Track , 2011 .
[19] Sz. Fischer,et al. Superstructure Stabilization of Ballast Bedded Railway Tracks with Geogrids , 2011 .
[20] Buddhima Indraratna,et al. Effect of confining pressure on the degradation of ballast under cyclic loading , 2005 .
[21] Ennio M. Palmeira,et al. Performance of geosynthetic-reinforced alternative sub-ballast material in a railway track. , 2008 .
[22] Nick Thom,et al. Identifying the key parameters that influence geogrid reinforcement of railway ballast , 2007 .
[23] Ernest T. Selig,et al. Track Geotechnology and Substructure Management , 1995 .
[24] Erol Tutumluer,et al. Laboratory Characterization of Coal Dust Fouled Ballast Behavior , 2008 .
[25] Sanjay Nimbalkar,et al. Future of Australian rail tracks capturing higher speeds with heavier freight , 2012 .