Toward productivity in future construction: mapping knowledge and finding insights for achieving successful offsite construction projects

Although offsite construction (OSC) has emerged as a promising solution to low productivity issues in the construction industry, knowledge for effective management of OSC projects is yet to be explored and developed further. To enhance our understanding of the landscape of the current OSC management knowledge, this study identified and reviewed 83 operation-level OSC management papers. By mapping the papers on three dimensions (i.e. OSC project type, project phase, and management area), this review sheds light on the knowledge areas addressed more frequently than the other areas over time in a detailed manner. The review also shows that papers on planning, manufacturing, maintenance phases and schedule, resources, and stakeholder management areas have a relatively large number of citations, implying a great interest in these research areas. Finally, the review discusses that substantial research work is still required in the areas of OSC execution strategy, emerging technologies in offsite manufacturing and schedule management, internet of things (IoT)-based material logistics planning and tracking, building information model-based visualization and decision support, and social and environmental effects of stakeholder engagement in OSC projects.

[1]  Heap-Yih Chong,et al.  Environmental sustainability of off-site manufacturing: a literature review , 2019 .

[2]  Jahidul Alum,et al.  Construction productivity: Issues encountered by contractors in Singapore , 1995 .

[3]  Tao Wang,et al.  Case Study of Integrated Prefab Accommodations System for Migrant On-Site Construction Workers in China , 2016 .

[4]  Nicholas Chileshe,et al.  Lean and agile integration within offsite construction using discrete event simulation : A systematic literature review , 2016 .

[5]  Shang Gao,et al.  A holistic review of off-site construction literature published between 2008 and 2018 , 2018, Journal of Cleaner Production.

[6]  Zhaohan Sheng,et al.  Incentive Mechanism of Prefabrication in Mega Projects with Reputational Concerns , 2018 .

[7]  Wei Pan,et al.  Demystifying the cost barriers to offsite construction in the UK , 2011 .

[8]  Mehrdad Arashpour,et al.  Off-site construction optimization: sequencing multiple job classes with time constraints , 2016 .

[9]  Leo Sveikauskas,et al.  Productivity Growth in Construction , 2016 .

[10]  Daniel Mora-Meliá,et al.  Weather-wise: A weather-aware planning tool for improving construction productivity and dealing with claims , 2017 .

[11]  Nashwan Dawood,et al.  Intelligence approach to production planning system for bespoke precast concrete products , 2006 .

[12]  Gholamreza Heravi,et al.  Production process improvement of buildings’ prefabricated steel frames using value stream mapping , 2017 .

[13]  Noel Painting,et al.  Scientometric analysis of BIM-based research in construction engineering and management , 2019, Engineering, Construction and Architectural Management.

[14]  R. S. Kumar,et al.  STUDY ON COMPARISON BETWEEN PREFABRICATED AND CONVENTIONAL STRUCTURES , 2018 .

[15]  Xiangyu Wang,et al.  Analysis of stakeholder relationships in the industry chain of industrialized building in China , 2017 .

[16]  E. Zavadskas,et al.  Critical evaluation of off-site construction research: a scientometric analysis , 2018 .

[17]  Ali Akbarnezhad,et al.  A novel mathematical optimisation model for the scheduling of activities in modular construction factories , 2020 .

[18]  Jin-Hee Kim,et al.  Performance of Modular Prefabricated Architecture: Case Study-Based Review and Future Pathways , 2016 .

[19]  Chimay J. Anumba,et al.  An SCO-Enabled Logistics and Supply Chain–Management System in Construction , 2017 .

[20]  Mohamed Al-Hussein,et al.  Utilization of 3D Visualization of Mobile Crane Operations for Modular Construction On-Site Assembly , 2015 .

[21]  Rahinah Ibrahim,et al.  Industrialized Construction Chronology: The Disputes and Success Factors for a Resilient Construction Industry in Malaysia , 2017 .

[22]  Na Lu Ed.D.,et al.  Designers' and General Contractors' Perceptions of Offsite Construction Techniques in the United State Construction Industry , 2008 .

[23]  Kasun Hewage,et al.  Life cycle performance of modular buildings: A critical review , 2016 .

[24]  Mohamed Al-Hussein,et al.  Building information modelling for off-site construction: Review and future directions , 2019, Automation in Construction.

[25]  Chengshuang Sun,et al.  Research on assembly sequence planning and optimization of precast concrete buildings , 2018 .

[26]  Hao Hu,et al.  Dynamic response to demand variability for precast production rescheduling with multiple lines , 2018 .

[27]  Hao Hu,et al.  Synchronizing production scheduling with resources allocation for precast components in a multi-agent system environment , 2018 .

[28]  Samantha Organ,et al.  A literature review of the evolution of British prefabricated low-rise housing , 2016 .

[29]  Peng Li,et al.  Labor crew workspace analysis for prefabricated assemblies’ installation: A 4D-BIM-based approach , 2018 .

[30]  Graham Brewer,et al.  Contextual, structural and behavioural factors influencing the adoption of industrialised building systems: a review , 2018 .

[31]  Chao Mao,et al.  Structural Equation Modeling to Analyze the Critical Driving Factors and Paths for Off-site Construction in China , 2018 .

[32]  Ray Y. Zhong,et al.  Production lead-time hedging and coordination in prefabricated construction supply chain management , 2017, Int. J. Prod. Res..

[33]  Jian Zuo,et al.  Barriers to the transition towards off-site construction in China: An Interpretive structural modeling approach , 2018, Journal of Cleaner Production.

[34]  Geoffrey Qiping Shen,et al.  A model for simulating schedule risks in prefabrication housing production: A case study of six-day cycle assembly activities in Hong Kong , 2018, Journal of Cleaner Production.

[35]  Chengshuang Sun,et al.  Study on Cooperative Mechanism of Prefabricated Producers Based on Evolutionary Game Theory , 2017 .

[36]  Geoffrey Qiping Shen,et al.  Critical review of the research on the management of prefabricated construction , 2014 .

[37]  K. London,et al.  Understanding Stakeholders in Off-Site Manufacturing: A Literature Review , 2019, Journal of Construction Engineering and Management.

[38]  Wei Pan,et al.  Major Barriers to Off-Site Construction: The Developer’s Perspective in China , 2015 .

[39]  Shoujian Zhang,et al.  Effect of stakeholder collaborative management on off-site construction cost performance , 2018 .

[40]  Mehrdad Arashpour,et al.  Autonomous production tracking for augmenting output in off-site construction , 2015 .

[41]  David K. H. Chua,et al.  IFC-Based Framework to Move beyond Individual Building Elements toward Configuring a Higher Level of Prefabrication , 2013 .

[42]  Hazar Dib,et al.  Structural Equation Model of Building Information Modeling Maturity , 2016 .

[43]  Hao Hu,et al.  Precast supply chain management in off-site construction: A critical literature review , 2019, Journal of Cleaner Production.

[44]  Kudirat Olabisi Ayinla,et al.  Demystifying the concept of offsite manufacturing method: Towards a robust definition and classification system , 2019 .

[45]  Min-Yuan Cheng,et al.  Integrating barcode and GIS for monitoring construction progress , 2002 .

[46]  Margaret K.Y. Mok,et al.  Schedule risks in prefabrication housing production in Hong Kong: a social network analysis , 2016 .