An economic production quantity model with backlogging and imperfect rework process for uncertain demand
暂无分享,去创建一个
[1] Abolfazl Gharaei,et al. An integrated multi-product, multi-buyer supply chain under penalty, green, and quality control polices and a vendor managed inventory with consignment stock agreement: The outer approximation with equality relaxation and augmented penalty algorithm , 2019, Applied Mathematical Modelling.
[2] Hsien-Jen Lin,et al. Two-echelon stochastic inventory system with returns and partial backlogging , 2015, Int. J. Syst. Sci..
[3] L. Ouyang,et al. An arithmetic-geometric mean inequality approach for determining the optimal production lot size with backlogging and imperfect rework process , 2016 .
[4] Saeed Zolfaghari,et al. A review of the extensions of a modified EOQ model for imperfect quality items , 2011 .
[5] Walid W. Nasr,et al. Production lot sizing with quality screening and rework , 2016 .
[6] Meir J. Rosenblatt,et al. Economic Production Cycles with Imperfect Production Processes , 1986 .
[7] Seyed Ashkan Hoseini Shekarabi,et al. Modelling And optimal lot-sizing of the replenishments in constrained, multi-product and bi-objective EPQ models with defective products: Generalised Cross Decomposition , 2020, International Journal of Systems Science: Operations & Logistics.
[8] G. Gallego. Scheduling the production of several items with random demands in a single facility , 1990 .
[9] Biswajit Sarkar,et al. Easy and Improved Algorithms to Joint Determination of the Replenishment Lot Size and Number of Shipments for an Epq Model with Rework , 2013 .
[10] Peter W. Glynn,et al. Managing Capacity and Inventory Jointly in Manufacturing Systems , 2002, Manag. Sci..
[12] Y. Chiu. Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging , 2003 .
[13] Singa Wang Chiu,et al. Production lot size problem with failure in repair and backlogging derived without derivatives , 2008, Eur. J. Oper. Res..
[14] Walid W. Nasr,et al. Economic production quantity with maintenance interruptions under random and correlated yields , 2017, Int. J. Prod. Res..
[15] Leopoldo Eduardo Cárdenas-Barrón,et al. An improved solution to the replenishment policy for the EMQ model with rework and multiple shipments , 2013 .
[16] L. Cárdenas-Barrón,et al. Multi products single machine EPQ model with immediate rework process , 2012 .
[17] K. S. Chaudhuri,et al. Maximising profits for an EPQ model with unreliable machine and rework of random defective items , 2013, Int. J. Syst. Sci..
[18] J. Sicilia,et al. Optimal lot size for a production–inventory system with partial backlogging and mixture of dispatching policies , 2014 .
[19] Salwa Hanim Abdul-Rashid,et al. Economic order quantity models for items with imperfect quality and emission considerations , 2018 .
[20] R. Vickson. A Single Product Cycling Problem Under Brownian Motion Demand , 1986 .
[21] Ata Allah Taleizadeh,et al. An improved solution to replenishment lot size problem with discontinuous issuing policy and rework, and the multi-delivery policy into economic production lot size problem with partial rework , 2012, Expert Syst. Appl..
[22] Monami Das Roy,et al. An economic production lot size model for defective items with stochastic demand, backlogging and rework , 2014 .
[23] Ata Allah Taleizadeh,et al. Pricing and lot sizing for an EPQ inventory model with rework and multiple shipments , 2016 .
[24] Anja Walter,et al. Introduction To Stochastic Calculus With Applications , 2016 .
[25] Manoranjan Maiti,et al. A single period inventory model with imperfect production and stochastic demand under chance and imprecise constraints , 2008, Eur. J. Oper. Res..
[26] Hui-Ming Wee,et al. Multi-product production quantity model with repair failure and partial backordering , 2010, Comput. Ind. Eng..
[27] L. Cárdenas-Barrón,et al. Learning and screening errors in an EPQ inventory model for supply chains with stochastic lead time demands , 2017, Int. J. Prod. Res..
[28] Chao Deng,et al. Selective maintenance scheduling under stochastic maintenance quality with multiple maintenance actions , 2018, Int. J. Prod. Res..
[29] Hui-Ming Wee,et al. An economic production quantity model with non-synchronized screening and rework , 2014, Appl. Math. Comput..
[30] A. H. Nobil,et al. Economic production quantity model considering warm-up period in a cleaner production environment , 2018, Int. J. Prod. Res..
[31] Allen H. Tai. Economic production quantity models for deteriorating/imperfect products and service with rework , 2013, Comput. Ind. Eng..
[32] S. T. A. Niaki,et al. A multiproduct single machine economic production quantity model for an imperfect production system under warehouse construction cost , 2015 .
[33] Shib Sankar Sana,et al. A mathematical model on EPQ for stochastic demand in an imperfect production system , 2013 .
[34] Hsien-Jen Lin,et al. Two-critical-number control policy for a stochastic production inventory system with partial backlogging , 2017, Int. J. Prod. Res..
[35] Ata Allah Taleizadeh,et al. Determining Replenishment Lot Size and Shipment Policy for an EPQ Inventory Model with Delivery and Rework , 2015 .
[36] Adriana Leiras,et al. Economic production quantity (EPQ) model with partial backordering and a discount for imperfect quality batches , 2018, Int. J. Prod. Res..
[37] P. A. Hayek,et al. Production lot sizing with the reworking of imperfect quality items produced , 2001 .
[38] L. Ouyang,et al. Optimal production lot with imperfect production process under permissible delay in payments and complete backlogging , 2013 .
[39] Jia-Tzer Hsu,et al. Economic production quantity (EPQ) models under an imperfect production process with shortages backordered , 2016, Int. J. Syst. Sci..
[40] Hsien-Jen Lin. A collaborating inventory system in a supply chain under Brownian motion demand and imperfect quality , 2014 .
[41] Rezg Nidhal,et al. Joint optimisation of maintenance and production policies considering random demand and variable production rate , 2012 .
[42] Shib Sankar Sana,et al. A production-inventory model in an imperfect production process , 2010, Eur. J. Oper. Res..
[43] B. Bidanda,et al. Optimal decision of an economic production quantity model for imperfect manufacturing under hybrid maintenance policy with shortages and partial backlogging , 2018, Int. J. Prod. Res..
[44] Singa Wang Chiu,et al. Mathematical modeling for production system with backlogging and failure in repair , 2006 .
[45] J. Bather. A continuous time inventory model , 1966, Journal of Applied Probability.
[46] Dacheng Yao. Joint pricing and inventory control for a stochastic inventory system with Brownian motion demand , 2016, 1608.03033.
[47] Shib Sankar Sana,et al. An economic production lot size model in an imperfect production system , 2010, Eur. J. Oper. Res..
[48] Gad Allon,et al. Global Dual Sourcing: Tailored Base-Surge Allocation to Near- and Offshore Production , 2010, Manag. Sci..
[49] Michael Trott. The Mathematica GuideBook for Numerics , 2005 .