Joint optimisation of capacity and safety stock allocation

We study the joint optimisation of capacity and safety stock allocation in assembly systems. Particularly, we consider capacitated systems with base-stock policies and periodic review. Capacity allocation is restricted by budget constraints, which can connect multiple systems. Our objective is to minimise overall inventory holding costs while satisfying service level as well as budget constraints. We propose an algorithm to jointly approximate optimal capacity allocation and base-stock levels. To this end, we introduce a set of convex approximations for this non-convex optimisation problem. In order to solve the resulting convex programmes, we analytically compute sample path derivatives via infinitesimal perturbation analysis. By iteratively adapting the approximations, we achieve good capacity allocations and base-stock levels for the original problem. Furthermore, we introduce a heuristic to allocate capacity, which originates from link capacity allocation in communication networks and use it as a benchmark. The algorithm is applied to small illustrative examples as well as cases motivated by the semiconductor manufacturing process at IBM Systems. It turns out that particularly for high utilisation levels, our algorithm can achieve significant improvements compared to the capacity allocation heuristic.

[1]  Andrew Gelman,et al.  Handbook of Markov Chain Monte Carlo , 2011 .

[2]  Fred W. Glover,et al.  Simulation optimization: a review, new developments, and applications , 2005, Proceedings of the Winter Simulation Conference, 2005..

[3]  Yurii Nesterov,et al.  Introductory Lectures on Convex Optimization - A Basic Course , 2014, Applied Optimization.

[4]  James R. Wilson,et al.  Convergence Properties of the Batch Means Method for Simulation Output Analysis , 2001, INFORMS J. Comput..

[5]  P. Young,et al.  Time series analysis, forecasting and control , 1972, IEEE Transactions on Automatic Control.

[6]  Rubén Ruiz,et al.  Operational planning and control of semiconductor wafer production , 2006 .

[7]  Dimitri P. Bertsekas,et al.  Data Networks , 1986 .

[8]  Kaj Rosling,et al.  Optimal Inventory Policies for Assembly Systems Under Random Demands , 1989, Oper. Res..

[9]  Evan L. Porteus,et al.  Simultaneous Capacity and Production Management of Short-Life-Cycle, Produce-to-Stock Goods Under Stochastic Demand , 2002, Manag. Sci..

[10]  Sigrún Andradóttir,et al.  A review of simulation optimization techniques , 1998, 1998 Winter Simulation Conference. Proceedings (Cat. No.98CH36274).

[11]  Paul Glasserman,et al.  Sensitivity Analysis for Base-Stock Levels in Multiechelon Production-Inventory Systems , 1995 .

[12]  S. Tayur Computing the Optimal Policy for Capacitated Inventory Models , 1993 .

[13]  S. D. Wu,et al.  Managing Capacity in the High-Tech Industry: A Review of Literature , 2005 .

[14]  Stephen C. Graves,et al.  Strategic Safety-Stock Placement in Supply Chains with Capacity Constraints , 2016, Manuf. Serv. Oper. Manag..

[15]  Marco Laumanns,et al.  Simulation-Based Optimization of Capacitated Assembly Systems under Beta-Service Level Constraints , 2018, Decis. Sci..

[16]  Jun Zhang,et al.  Managing Inventory and Supply Performance in Assembly Systems with Random Supply Capacity and Demand , 2004, Manag. Sci..

[17]  George E. P. Box,et al.  Time Series Analysis: Box/Time Series Analysis , 2008 .

[18]  Sean P. Willems,et al.  Optimizing Strategic Safety Stock Placement in Supply Chains , 2000, Manuf. Serv. Oper. Manag..

[19]  Michael C. Fu,et al.  Optimization via simulation: A review , 1994, Ann. Oper. Res..

[20]  J. Banks,et al.  Handbook of Simulation , 1998 .

[21]  Awi Federgruen,et al.  An Inventory Model with Limited Production Capacity and Uncertain Demands II. The Discounted-Cost Criterion , 1986, Math. Oper. Res..

[22]  Karl G. Kempf,et al.  Optimizing Capital Investment Decisions at Intel Corporation , 2013, Interfaces.

[23]  H. Scarf THE OPTIMALITY OF (S,S) POLICIES IN THE DYNAMIC INVENTORY PROBLEM , 1959 .

[24]  Woonghee Tim Huh,et al.  Base‐stock policies in capacitated assembly systems: Convexity properties , 2010 .

[25]  Paul Glasserman,et al.  The Stability of a Capacitated, Multi-Echelon Production-Inventory System Under a Base-Stock Policy , 1994, Oper. Res..

[26]  Hendrik Van Landeghem,et al.  Safety stock placement problem in capacitated supply chains , 2008 .

[27]  Peter W. Glynn,et al.  Managing Capacity and Inventory Jointly in Manufacturing Systems , 2002, Manag. Sci..

[28]  Awi Federgruen,et al.  An Inventory Model with Limited Production Capacity and Uncertain Demands I. The Average-Cost Criterion , 1986, Math. Oper. Res..

[29]  Dimitri P. Bertsekas,et al.  Data networks (2nd ed.) , 1992 .

[30]  A.P. Barbosa-Povoa,et al.  Operations and supply chain management , 2008, 2008 IEEE International Engineering Management Conference.

[31]  Alan Scheller-Wolf,et al.  Now or Later: A Simple Policy for Effective Dual Sourcing in Capacitated Systems , 2008, Oper. Res..