Multi-agent scheduling in a no-wait flow shop system to maximize the weighted number of just-in-time jobs
暂无分享,去创建一个
[1] Yuanwei Jing,et al. Optimal Research and Numerical Simulation for Scheduling No-Wait Flow Shop in Steel Production , 2013, J. Appl. Math..
[2] Alessandro Agnetis,et al. Multi-agent single machine scheduling , 2007, Ann. Oper. Res..
[3] Chelliah Sriskandarajah,et al. A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process , 1996, Oper. Res..
[4] Jose M. Framiñan,et al. A common framework and taxonomy for multicriteria scheduling problems with interfering and competing jobs: Multi-agent scheduling problems , 2014, Eur. J. Oper. Res..
[5] Joseph Y.-T. Leung,et al. Competitive Two-Agent Scheduling and Its Applications , 2010, Oper. Res..
[6] T. C. Edwin Cheng,et al. Fixed interval scheduling: Models, applications, computational complexity and algorithms , 2007, Eur. J. Oper. Res..
[7] T. C. Edwin Cheng,et al. A note on the complexity of the problem of two-agent scheduling on a single machine , 2006, J. Comb. Optim..
[8] Joanna Józefowska,et al. Just-in-Time Scheduling : Models and Algorithms for Computer and Manufacturing Systems , 2007 .
[9] Jon M. Peha,et al. Heterogeneous-criteria scheduling: Minimizing weighted number of tardy jobs and weighted completion time , 1995, Comput. Oper. Res..
[10] Mihalis Yannakakis,et al. On the approximability of trade-offs and optimal access of Web sources , 2000, Proceedings 41st Annual Symposium on Foundations of Computer Science.
[11] Yu-Hsiang Chung,et al. A parallel-machine scheduling problem with two competing agents , 2017 .
[12] Byung-Cheon Choi,et al. Maximizing the weighted number of just-in-time jobs in flow shop scheduling , 2007 .
[13] Alessandro Agnetis,et al. Scheduling Problems with Two Competing Agents , 2004, Oper. Res..
[14] Claudio Arbib,et al. A competitive scheduling problem and its relevance to UMTS channel assignment , 2004, Networks.
[15] Ali Allahverdi,et al. A survey of scheduling problems with no-wait in process , 2016, Eur. J. Oper. Res..
[16] Hans Röck,et al. Some new results in flow shop scheduling , 1984, Z. Oper. Research.
[17] T. C. Edwin Cheng,et al. Multi-agent scheduling on a single machine with max-form criteria , 2008, Eur. J. Oper. Res..
[18] Lin Chen,et al. Approximation schemes for two-machine flow shop scheduling with two agents , 2012, J. Comb. Optim..
[19] Wen-Chiung Lee,et al. A two-machine flowshop problem with two agents , 2011, Comput. Oper. Res..
[20] Gur Mosheiov,et al. Single machine scheduling to minimize the number of early and tardy jobs , 1996, Comput. Oper. Res..
[21] Kunihiko Hiraishi,et al. Scheduling of parallel identical machines to maximize the weighted number of just-in-time jobs , 2000, Comput. Oper. Res..
[22] Shao Chin Sung,et al. A quadratic time algorithm to maximize the number of just-in-time jobs on identical parallel machines , 2005, Comput. Oper. Res..
[23] Chelliah Sriskandarajah,et al. A review of TSP based approaches for flowshop scheduling , 2006, Eur. J. Oper. Res..
[24] Dvir Shabtay,et al. Maximizing the weighted number of just-in-time jobs in several two-machine scheduling systems , 2010, Journal of Scheduling.
[25] Erhan Kozan,et al. Scheduling Trains with Priorities: A No-Wait Blocking Parallel-Machine Job-Shop Scheduling Model , 2011, Transp. Sci..
[26] Fardin Ahmadizar,et al. Single-machine earliness–tardiness scheduling with two competing agents and idle time , 2017 .
[27] Gur Mosheiov,et al. A note: Maximizing the weighted number of just-in-time jobs on a proportionate flowshop , 2015, Inf. Process. Lett..
[28] Yunqiang Yin,et al. Just-in-time scheduling with two competing agents on unrelated parallel machines ☆ , 2016 .
[29] Omri Dover,et al. Single-machine two-agent scheduling involving a just-in-time criterion , 2015 .
[30] David S. Johnson,et al. Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .
[31] Jonathan Cole Smith,et al. A Multiple-Criterion Model for Machine Scheduling , 2003, J. Sched..
[32] Byung-Cheon Choi,et al. Two-agent single-machine scheduling problem with just-in-time jobs , 2014, Theor. Comput. Sci..
[33] Hans Röck,et al. The Three-Machine No-Wait Flow Shop is NP-Complete , 1984, JACM.
[34] Dvir Shabtay,et al. The just-in-time scheduling problem in a flow-shop scheduling system , 2012, Eur. J. Oper. Res..
[35] Shao Chin Sung,et al. Maximizing Weighted number of Just-in-Time Jobs on Unrelated Parallel Machines , 2005, J. Sched..
[36] T. C. Edwin Cheng,et al. Multi-agent scheduling on a single machine to minimize total weighted number of tardy jobs , 2006, Theor. Comput. Sci..
[37] Byung-Cheon Choi,et al. Approximation algorithms for multi-agent scheduling to minimize total weighted completion time , 2009, Inf. Process. Lett..
[38] Gur Mosheiov,et al. Scheduling problems with two competing agents to minimize minmax and minsum earliness measures , 2010, Eur. J. Oper. Res..
[39] Wenzhu Liao,et al. Multi-objective group scheduling optimization integrated with preventive maintenance , 2017 .
[40] Shaohua Zhang,et al. Predictive-reactive scheduling for single surgical suite subject to random emergency surgery , 2015, J. Comb. Optim..
[41] Michael Pinedo,et al. Scheduling: Theory, Algorithms, and Systems , 1994 .
[42] R. Gomory,et al. Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem , 1964 .