Delays and Cost Overruns Causes During Construction of Palm Oil Refinery Projects
暂无分享,去创建一个
[1] Mohan M. Kumaraswamy,et al. An evaluation of construction time performance in the building industry , 1996 .
[2] N. Mansfield,et al. Causes of delay and cost overruns in Nigerian construction projects , 1994 .
[3] Paul. Olomolaiye,et al. Attributes of UK construction clients influencing project consultants' performance , 1994 .
[4] Ismail Abdul Rahman,et al. Factors Affecting Construction Cost in Mara Large Construction Project: Perspective of Project Management Consultant , 2010 .
[5] Norngainy Mohd Tawil,et al. Cause of construction delay - Theoretical framework , 2011 .
[6] Noor Amila Wan Abdullah Zawawi,et al. Attributes of coordination process in construction projects , 2016 .
[7] Ernawati,et al. The significant factors causing delay of building construction projects in Malaysia , 2007 .
[8] Oko John Ameh,et al. STUDY OF RELATIONSHIP BETWEEN TIME OVERRUN AND PRODUCTIVITY ON CONSTRUCTION SITES , 2011 .
[9] Siew Hoong Shuit,et al. OIL PALM BIOMASS AS A SUSTAINABLE ENERGY SOURCE: A MALAYSIAN CASE STUDY , 2009 .
[10] C. H. Teoh,et al. Key Sustainability Issues in the Palm Oil Sector , 2010 .
[11] Ismail Abdul Rahman,et al. Time and Cost Performance in Construction Projects in Southern and Central Regions of Peninsular Malaysia , 2012 .
[12] Noor Amila Wan Abdullah Zawawi,et al. Delphi Technique Procedures: A New Perspective in Construction Management Research , 2015 .
[13] Noor Amila Wan Abdullah Zawawi,et al. Identification of coordination factors affecting building projects performance , 2016 .
[14] Mohd Shahir Liew,et al. The characteristics of coordination process in construction projects , 2015, 2015 International Symposium on Technology Management and Emerging Technologies (ISTMET).
[15] A. M. Odeh,et al. Causes of construction delay: traditional contracts , 2002 .
[16] G. Guyatt,et al. Validity and Reliability of a Questionnaire for Measuring Child Oral-health-related Quality of Life , 2002, Journal of dental research.
[17] Frank Fugar,et al. Delays in Building Construction Projects in Ghana , 2010 .
[18] Murali Sambasivan,et al. Causes and effects of delays in Malaysian construction industry , 2007 .
[19] Noor Amila Wan Abdullah Zawawi,et al. Coordination process in construction projects management , 2016 .
[20] Noor Amila Wan Abdullah Zawawi,et al. Communication, coordination and cooperation in construction projects: business environment and human behaviours , 2017 .
[21] Long Le-Hoai,et al. Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries , 2008 .
[22] Mohd Shahir Liew,et al. A Framework for Coordination Process into Construction Projects , 2016 .
[23] H. Hoel,et al. Measuring exposure to bullying and harassment at work: Validity, factor structure and psychometric properties of the Negative Acts Questionnaire-Revised , 2009 .
[24] Gary David Holt,et al. Factors influencing construction time and cost overruns on high-rise projects in Indonesia , 1997 .