Delays and Cost Overruns Causes During Construction of Palm Oil Refinery Projects

Delays and cost overruns are obviously common problems in the construction industry in several developed and developing nations. The purpose of this study is to identify factors cause delays and cost overruns in the construction of palm oil refinery projects in Malaysia. A questionnaire survey of a randomly selected sample was filled by 89 respondents. The questionnaire included 179 factors which classified into 13 groups. The degree of importance of the delays and cost overrun factors were evaluated and ranked by importance degree, based on the viewpoints of stakeholders. The data was analytically investigated by descriptive statistic methods and Relative Important Index (RII). The results of RII showed that Delays in subcontractor’s work, Lack of subcontractor skill, and Poor/inadequate planning and scheduling with RII 0.78, 0.77, and 0.75, respectively, are the most important causes. These causes represent the baseline margin for project management of palm oil refinery construction and development. According to these results, it is suggested that: project client should collaborate with contractors and simplify payments procedures to mitigate delays; coordinate continuously and enhance the association among project stakeholders are obligatory in order to improve the project performance.

[1]  Mohan M. Kumaraswamy,et al.  An evaluation of construction time performance in the building industry , 1996 .

[2]  N. Mansfield,et al.  Causes of delay and cost overruns in Nigerian construction projects , 1994 .

[3]  Paul. Olomolaiye,et al.  Attributes of UK construction clients influencing project consultants' performance , 1994 .

[4]  Ismail Abdul Rahman,et al.  Factors Affecting Construction Cost in Mara Large Construction Project: Perspective of Project Management Consultant , 2010 .

[5]  Norngainy Mohd Tawil,et al.  Cause of construction delay - Theoretical framework , 2011 .

[6]  Noor Amila Wan Abdullah Zawawi,et al.  Attributes of coordination process in construction projects , 2016 .

[7]  Ernawati,et al.  The significant factors causing delay of building construction projects in Malaysia , 2007 .

[8]  Oko John Ameh,et al.  STUDY OF RELATIONSHIP BETWEEN TIME OVERRUN AND PRODUCTIVITY ON CONSTRUCTION SITES , 2011 .

[9]  Siew Hoong Shuit,et al.  OIL PALM BIOMASS AS A SUSTAINABLE ENERGY SOURCE: A MALAYSIAN CASE STUDY , 2009 .

[10]  C. H. Teoh,et al.  Key Sustainability Issues in the Palm Oil Sector , 2010 .

[11]  Ismail Abdul Rahman,et al.  Time and Cost Performance in Construction Projects in Southern and Central Regions of Peninsular Malaysia , 2012 .

[12]  Noor Amila Wan Abdullah Zawawi,et al.  Delphi Technique Procedures: A New Perspective in Construction Management Research , 2015 .

[13]  Noor Amila Wan Abdullah Zawawi,et al.  Identification of coordination factors affecting building projects performance , 2016 .

[14]  Mohd Shahir Liew,et al.  The characteristics of coordination process in construction projects , 2015, 2015 International Symposium on Technology Management and Emerging Technologies (ISTMET).

[15]  A. M. Odeh,et al.  Causes of construction delay: traditional contracts , 2002 .

[16]  G. Guyatt,et al.  Validity and Reliability of a Questionnaire for Measuring Child Oral-health-related Quality of Life , 2002, Journal of dental research.

[17]  Frank Fugar,et al.  Delays in Building Construction Projects in Ghana , 2010 .

[18]  Murali Sambasivan,et al.  Causes and effects of delays in Malaysian construction industry , 2007 .

[19]  Noor Amila Wan Abdullah Zawawi,et al.  Coordination process in construction projects management , 2016 .

[20]  Noor Amila Wan Abdullah Zawawi,et al.  Communication, coordination and cooperation in construction projects: business environment and human behaviours , 2017 .

[21]  Long Le-Hoai,et al.  Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries , 2008 .

[22]  Mohd Shahir Liew,et al.  A Framework for Coordination Process into Construction Projects , 2016 .

[23]  H. Hoel,et al.  Measuring exposure to bullying and harassment at work: Validity, factor structure and psychometric properties of the Negative Acts Questionnaire-Revised , 2009 .

[24]  Gary David Holt,et al.  Factors influencing construction time and cost overruns on high-rise projects in Indonesia , 1997 .