Tutorial: Illusion of capacity — Challenge of incorporating the complexity of FAB capacity (tool deployment & operating curve) into central planning for firms with substantial non-fab complexity
暂无分享,去创建一个
[1] D. P. Martin. Capacity and cycle time-throughput understanding system (CAC-TUS) an analysis tool to determine the components of capacity and cycle time in a semiconductor manufacturing line , 1999, 10th Annual IEEE/SEMI. Advanced Semiconductor Manufacturing Conference and Workshop. ASMC 99 Proceedings (Cat. No.99CH36295).
[2] Kenneth Fordyce,et al. The Ongoing Challenge: Creating an Enterprise-Wide Detailed Supply Chain Plan for Semiconductor and Package Operations , 2011 .
[3] Yi-Feng Hung,et al. Hybrid capacity modeling for alternative machine types in linear programming production planning , 2002 .
[4] J.R. Morrison,et al. Cycle Time Approximations for the G/G/m Queue Subject to Server Failures and Cycle Time Offsets with Applications , 2006, The 17th Annual SEMI/IEEE ASMC 2006 Conference.
[5] Salah E. Elmaghraby. Production Capacity: Its Bases, Functions and Measurement , 2011 .
[6] Stuart Bermon,et al. Capacity Optimization Planning System (CAPS) , 1999, Interfaces.
[7] Beth Tibbitts. Flexible simulation of a complex semiconductor manufacturing line using a rule-based system , 1993, IBM J. Res. Dev..
[8] R. Uzsoy,et al. An Experimental Comparison of Production Planning Using Clearing Functions and Iterative Linear Programming-Simulation Algorithms , 2012, IEEE Transactions on Semiconductor Manufacturing.
[9] Roland E. A. Schelasin. Using static capacity modeling and queuing theory equations to predict factory cycle time performance in semiconductor manufacturing , 2011, Proceedings of the 2011 Winter Simulation Conference (WSC).
[10] Sugato Bagchi,et al. A full-factory simulator as a daily decision-support tool for 300MM wafer fabrication productivity , 2008, 2008 Winter Simulation Conference.
[11] Reha Uzsoy,et al. Planning Production and Inventories in the Extended Enterprise , 2011 .
[12] Uday S. Karmarkar,et al. Production Planning Under Uncertainty with Workload-Dependent Lead Times: Lagrangean Bounds and Heuristics , 2011 .
[13] Kenneth Fordyce,et al. The Ongoing Challenge for a Responsive Demand Supply Network: The Final Frontier—Controlling the Factory , 2012 .