Tutorial: Illusion of capacity — Challenge of incorporating the complexity of FAB capacity (tool deployment & operating curve) into central planning for firms with substantial non-fab complexity

Since the early 1990s, organizations have focused on making smarter decisions in their integrated supply chain central planning, but the representation of capacity and cycle time has remained static and linear in contrast to its complex nature. This includes central planning for firms with semiconductor fabrication facilities (FABS) as a component of a complex demand supply network(DSN) where much of the complexity is non-FAB. Developing more intelligent solutions for capacity in central planning within computational and process limitations is a critical challenge. For DSNs with FABS, twin challenges are tool deployment and the operating curve. Many in the FAB community are aware of these complexities; options proposed and some implemented within “aggregate FAB planning,” rarely within central planning. This tutorial reviews the current state of central planning with respect to capacity and cycle time, outlines the challenges these complexities place on central planning structures, and indicates possible solutions.

[1]  D. P. Martin Capacity and cycle time-throughput understanding system (CAC-TUS) an analysis tool to determine the components of capacity and cycle time in a semiconductor manufacturing line , 1999, 10th Annual IEEE/SEMI. Advanced Semiconductor Manufacturing Conference and Workshop. ASMC 99 Proceedings (Cat. No.99CH36295).

[2]  Kenneth Fordyce,et al.  The Ongoing Challenge: Creating an Enterprise-Wide Detailed Supply Chain Plan for Semiconductor and Package Operations , 2011 .

[3]  Yi-Feng Hung,et al.  Hybrid capacity modeling for alternative machine types in linear programming production planning , 2002 .

[4]  J.R. Morrison,et al.  Cycle Time Approximations for the G/G/m Queue Subject to Server Failures and Cycle Time Offsets with Applications , 2006, The 17th Annual SEMI/IEEE ASMC 2006 Conference.

[5]  Salah E. Elmaghraby Production Capacity: Its Bases, Functions and Measurement , 2011 .

[6]  Stuart Bermon,et al.  Capacity Optimization Planning System (CAPS) , 1999, Interfaces.

[7]  Beth Tibbitts Flexible simulation of a complex semiconductor manufacturing line using a rule-based system , 1993, IBM J. Res. Dev..

[8]  R. Uzsoy,et al.  An Experimental Comparison of Production Planning Using Clearing Functions and Iterative Linear Programming-Simulation Algorithms , 2012, IEEE Transactions on Semiconductor Manufacturing.

[9]  Roland E. A. Schelasin Using static capacity modeling and queuing theory equations to predict factory cycle time performance in semiconductor manufacturing , 2011, Proceedings of the 2011 Winter Simulation Conference (WSC).

[10]  Sugato Bagchi,et al.  A full-factory simulator as a daily decision-support tool for 300MM wafer fabrication productivity , 2008, 2008 Winter Simulation Conference.

[11]  Reha Uzsoy,et al.  Planning Production and Inventories in the Extended Enterprise , 2011 .

[12]  Uday S. Karmarkar,et al.  Production Planning Under Uncertainty with Workload-Dependent Lead Times: Lagrangean Bounds and Heuristics , 2011 .

[13]  Kenneth Fordyce,et al.  The Ongoing Challenge for a Responsive Demand Supply Network: The Final Frontier—Controlling the Factory , 2012 .