Capacity and delay analysis for airport manoeuvring areas using simulation
暂无分享,去创建一个
Aydan Cavcar | Cem Cetek | Ertan Cinar | Fulya Aybek | C. Çetek | E. Çinar | A. Cavcar | Fulya Aybek
[1] Byung J. Kim,et al. Runway Exit Designs for Capacity Improvement Demonstrations. Phase 2. Computer Model Development , 1992 .
[2] S. D. Hill,et al. SPSA/SIMMOD optimization of air traffic delay cost , 1997, Proceedings of the 1997 American Control Conference (Cat. No.97CH36041).
[3] C. Müller,et al. An Analysis of Delay and Travel Times at Sao Paulo International Airport (AISP/GRU): Planning Based on Simulation Model , 2003 .
[4] Gao Wei,et al. Notice of RetractionA Simulation Study on airport capacity and the factors , 2010, 2010 3rd International Conference on Computer Science and Information Technology.
[5] N Martel. APPLICATION OF SIMMOD-BASED SIMULATION: CONSULTANTS/AIRPORT OPERATORS' PERSPECTIVE. MONTREAL DORVAL (YUL) CASE STUDY , 2001 .
[6] Randall P. Sadowski,et al. Simulation with Arena , 1998 .
[7] Averill M. Law,et al. Simulation Modeling and Analysis , 1982 .
[8] Wang Chao,et al. Simulation Study on Airfield System Capacity Analysis Using SIMMOD , 2008, 2008 International Symposium on Computational Intelligence and Design.
[9] Xiaohao Xu,et al. SIMMOD Based Simulation Optimization of Flight Delay Cost for Multi-airport System , 2008, 2008 International Conference on Intelligent Computation Technology and Automation (ICICTA).
[10] Nan Li,et al. The Research on Airport Ground Capacity Evaluation Based on 3-Dimensional Airport TWR Simulation System , 2009, 2009 International Conference on Measuring Technology and Mechatronics Automation.
[11] Heinz Erzberger,et al. A Fast-Time Simulation Tool for Analysis of Airport Arrival Traffic , 2004 .