Optimal cyclic scheduling for printed circuit board production lines with multiple hoists and general processing sequence
暂无分享,去创建一个
[1] Zelda B. Zabinsky,et al. An algorithm for scheduling a chemical processing tank line , 1993 .
[2] L. Lei,et al. DETERMINING OPTIMAL CYCLIC HOIST SCHEDULES IN A SINGLE-HOIST ELECTROPLATING LINE , 1994 .
[3] Eugene Levner,et al. Minimizing the number of robots to meet a given cyclic schedule , 1997, Ann. Oper. Res..
[4] Yves Crama,et al. Cyclic scheduling in robotic flowshops , 2000, Ann. Oper. Res..
[5] Henry L. W. Nuttle,et al. Hoist Scheduling For A PCB Electroplating Facility , 1988 .
[6] Eugene Levner,et al. Cyclic Scheduling of Operations for a Part Type in an FMS Handled by a Single Robot: A Parametric Critical-Path Approach , 1998 .
[7] Bruno Legeard,et al. Hoist scheduling problem: an approach based on constraint logic programming , 1992, Proceedings 1992 IEEE International Conference on Robotics and Automation.
[8] Yves Crama,et al. Robotic flowshop scheduling is strongly NP-complete , 1997 .
[9] Chengbin Chu,et al. Cyclic scheduling of a hoist with time window constraints , 1998, IEEE Trans. Robotics Autom..
[10] L. W. Phillips,et al. Mathematical Programming Solution of a Hoist Scheduling Program , 1976 .
[11] Christoph Moll,et al. On the Scheduling of One-Dimensional Transport Systems , 1997 .
[12] Xiaoguang Yang,et al. Optimal Cyclic Multi-Hoist Scheduling: A Mixed Integer Programming Approach , 2004, Oper. Res..
[13] Lei Lei,et al. The minimum common-cycle algorithm for cyclic scheduling of two material handling hoists with time window constraints , 1991 .