Optimal Lot-Sizing/Vehicle-Dispatching Policies Under Stochastic Lead Times and Stepwise Fixed Costs
暂无分享,去创建一个
Osman Alp | Nesim K. Erkip | Refik Güllü | N. Erkip | O. Alp | R. Güllü
[1] S. Nahmias,et al. Modeling Supply Chain Contracts: A Review , 1999 .
[2] Steven Nahmias,et al. Production and operations analysis , 1992 .
[3] Christopher H. Nevison,et al. The Dynamic Lot-Size Model with Stochastic Lead Times , 1984 .
[4] Matthew J. Liberatore. Planning Horizons for a Stochastic Lead-Time Inventory Model , 1977, Oper. Res..
[5] Awi Federgruen,et al. A Combined Vehicle Routing and Inventory Allocation Problem , 1984, Oper. Res..
[6] Garrett J. van Ryzin,et al. Dynamic Vehicle Dispatching: Optimal Heavy Traffic Performance and Practical Insights , 1999, Oper. Res..
[7] D. Blumenfeld,et al. Analyzing trade-offs between transportation, inventory and production costs on freight networks , 1985 .
[8] Laurence A. Wolsey,et al. Lot-Sizing with Constant Batches: Formulation and Valid Inequalities , 1993, Math. Oper. Res..
[9] David F. Pyke,et al. Optimal base stock policies and truck capacity in a two-echelon system , 1993 .
[10] David Simchi-Levi,et al. The logic of logistics , 1997 .
[11] Randolph W. Hall. Dispatching regular and express shipments between a supplier and manufacturer , 1989 .