STARC 2.0: an improved PERT network simulation tool
暂无分享,去创建一个
[1] M W Sasieni,et al. A note on PERT times , 1986 .
[2] Dale F. Cooper,et al. Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation , 1976 .
[3] T. K. Littlefield,et al. Reply-An Answer to Sasieni's Question on PERT Times , 1987 .
[4] D Golenko-Ginzburg,et al. PERT assumptions revisited , 1989 .
[5] John M Carroll. Simulation using personal computers , 1987 .
[6] D. Golenko-Ginzburg. On the Distribution of Activity Time in PERT , 1988 .
[7] K. MacCrimmon,et al. An Analytical Study of the PERT Assumptions , 1964 .
[8] Charles A. Gallagher,et al. Reply-A Note on PERT Assumptions , 1987 .
[9] Richard M. Van Slyke,et al. Letter to the Editor---Monte Carlo Methods and the PERT Problem , 1963 .
[10] Van Slyke,et al. MONTE CARLO METHODS AND THE PERT PROBLEM , 1963 .
[11] D. J. A. Welsh. Letter to the Editor-Errors Introduced by a PERT Assumption , 1965 .
[12] Joseph J. Moder,et al. Judgment Estimates of the Moments of Pert Type Distributions , 1968 .
[13] Adedeji Badiru. Towards the standardization of performance measures for project scheduling heuristics , 1988 .
[14] William J. Mcbride,et al. PERT and the beta distribution , 1967 .
[15] E. W. Davis,et al. Project Management With Cpm, Pert and Precedence Diagramming , 1983 .
[16] G. B. Wetherill,et al. Quality Control and Industrial Statistics , 1975 .
[17] Nicholas R. Farnum,et al. Some Results Concerning the Estimation of Beta Distribution Parameters in PERT , 1987 .
[18] Marvin D. Troutt. On the Generality of the PERT Average Time Formula , 1989 .