Determining the best sequence of load pickup during power system restoration
暂无分享,去创建一个
[1] R. Kafka,et al. Power System Restoration - A Task Force Report , 1987, IEEE Transactions on Power Systems.
[2] Marco Invernizzi,et al. Black-start and restoration of a part of the Italian HV network: modelling and simulation of a field test , 1996 .
[3] A.C.S. de Lima,et al. Guidelines for power system restoration in the Brazilian system , 2002, IEEE Transactions on Power Systems.
[4] C.-C. Liu,et al. Generation capability dispatch for bulk power system restoration: a knowledge-based approach , 1993 .
[5] M. M. Adibi,et al. Remote cranking of steam electric stations , 1996 .
[6] Hermann W. Dommel,et al. A framework for black start and power system restoration , 2000, 2000 Canadian Conference on Electrical and Computer Engineering. Conference Proceedings. Navigating to a New Era (Cat. No.00TH8492).
[7] E. Hirst,et al. New blackstart standards needed for competitive markets , 1999 .
[8] Chen-Ching Liu,et al. Tie line utilization during power system restoration , 1995 .
[9] M. M. Adibi,et al. Frequency response of prime movers during restoration , 1999 .
[10] P. Kundur,et al. Power system stability and control , 1994 .