Identifying and Analyzing the Factors Affecting Disassembly of Products in Remanufacturing Organizations

Abstract Disassembly is a key operation that differentiates remanufacturing from traditional manufacturing. However, various factors that affects the process of disassembly are not clearly understood by the researchers. This study focuses on identifying and analyzing the factors that affect the disassembly process in remanufacturing organizations. A literature survey is conducted to identify the factors that can influence the disassembly of products. A total of 17 factors are obtained which are further classified into three main factors viz. Organizational Capabilities (OC), Process Choices (PC) and Product Attributes (PA). An approach based on Analytical Hierarchy Process (AHP) is utilized to analyze the factors for developing a list of priority of these factors. A team of 8 experts from industry and academia is involved in this research for collecting their opinions. Results of this study show that product attributes play a key role in the disassembly of products for remanufacturing. ‘Value of recovered products’, ‘number of components’, ‘sequence of disassembly’, ‘volume of cores supply’ and ‘implementation of ecodesign principles’ are identified as the top five factors affecting the process of disassembly. The findings of this research can be useful for effective disassembly of products in remanufacturing based organizations. The decision makers of remanufacturing organizations can use the priority list of factors developed in this study for managing the disassembly activities in the organization.

[1]  Ali Mousavi,et al.  A computer-based product classification and component detection for demanufacturing processes , 2011, Int. J. Comput. Integr. Manuf..

[2]  Surendra M. Gupta,et al.  Operations Planning Issues in an Assembly/Disassembly Environment , 1994 .

[3]  Andrew Y. C. Nee,et al.  Design for Disassembly for Remanufacturing: Methodology and Technology , 2014 .

[4]  Cheng-Han Wu OEM product design in a price competition with remanufactured product , 2013 .

[5]  Marcello Colledani,et al.  Integrated Workstation Design and Buffer Allocation in Disassembly Systems for Remanufacturing , 2018 .

[6]  George Chryssolouris,et al.  Assembly system design and operations for product variety , 2011 .

[7]  J. D. Chiodo,et al.  Use of active disassembly technology to improve remanufacturing productivity: automotive application , 2014, Int. J. Comput. Integr. Manuf..

[8]  Bongju Jeong,et al.  A Heuristic for Disassembly Planning in Remanufacturing System , 2014, TheScientificWorldJournal.

[9]  Karl Inderfurth,et al.  How Yield Process Misspecification Affects the Solution of Disassemble-to-order Problems , 2015 .

[10]  Umit Bititci,et al.  Strategic operations framework for disassembly in remanufacturing , 2015 .

[11]  Umit Bititci,et al.  Disassembly for remanufacturing: a systematic literature review, new model development and future research needs , 2016 .

[12]  James F. C. Windmill,et al.  Design for remanufacture: a literature review and future research needs , 2011 .

[13]  E. Westkämper,et al.  Integrated Development of Assembly and Disassembly , 1999 .

[14]  Geraldo Ferrer,et al.  Value of information in remanufacturing complex products , 2004 .

[15]  Peggy Zwolinski,et al.  Remanufacturing strategies to support product design and redesign , 2008 .

[16]  Louise Lindkvist,et al.  Towards Facilitating Circular Product Life-Cycle Information Flow via Remanufacturing☆ , 2015 .

[17]  E. Sundin,et al.  Making functional sales environmentally and economically beneficial through product remanufacturing , 2005 .

[18]  Spyros Reveliotis,et al.  Uncertainty management in optimal disassembly planning through learning-based strategies , 2007 .

[19]  Winifred Ijomah,et al.  Addressing decision making for remanufacturing operations and design-for-remanufacture , 2009 .

[20]  E. Sundin,et al.  Case Study Analysis of Three Toner Cartridge Remanufacturers , 2005, 2005 4th International Symposium on Environmentally Conscious Design and Inverse Manufacturing.

[21]  Guoyin Wang,et al.  Erratum to “Experimental Analyses of the Major Parameters Affecting the Intensity of Outbursts of Coal and Gas” , 2014, The Scientific World Journal.

[22]  Hui-Ming Wee,et al.  Green-product-design value and information-technology investment on replenishment model with remanufacturing , 2010, Int. J. Comput. Integr. Manuf..

[23]  Johan Östlin,et al.  Importance of closed-loop supply chain relationships for product remanufacturing , 2008 .

[24]  Erik Sundin,et al.  Prerequisite factors for original equipment manufacturer remanufacturing , 2020, Journal of Cleaner Production.

[25]  Olga Battaïa,et al.  A decision support system to manage the quality of End-of-Life products in disassembly systems , 2016 .

[26]  Chandra Prakash Garg,et al.  An integrated framework for sustainable supplier selection and evaluation in supply chains , 2017 .

[27]  MengChu Zhou,et al.  Disassembly modeling, planning, and application , 2002 .