On improving the optimization process of a manufacturing run time problem with defective and machine breakdown
暂无分享,去创建一个
[1] Ming-Hon Hwang,et al. Integrating a cost reduction delivery policy into an imperfect production system with repairable items , 2010 .
[2] Yuan-Shyi Peter Chiu,et al. A note on "Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns" , 2007, Eur. J. Oper. Res..
[3] Hong-Dar Lin,et al. Mathematical modeling for solving manufacturing run time problem with defective rate and random machine breakdown , 2011, Comput. Ind. Eng..
[4] Yuan-Shyi Peter Chiu,et al. OPTIMAL LOT SIZING WITH SCRAP AND RANDOM BREAKDOWN OCCURRING IN BACKORDER REPLENISHING PERIOD , 2011 .
[5] A. Seidmann,et al. Production lot sizing with machine breakdowns , 1992 .
[6] Singa Wang Chiu,et al. Optimal production lot sizing with rework, scrap rate, and service level constraint , 2007, Math. Comput. Model..
[7] Hong-Dar Lin,et al. A note on optimal replenishment policy for imperfect quality EMQ model with rework and backlogging , 2008, Comput. Math. Appl..
[8] Hui-Ming Wee,et al. An integrated production-inventory model for ameliorating and deteriorating items taking account of time discounting , 2006, Math. Comput. Model..
[9] Yuan-Shyi Peter Chiu,et al. Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown , 2010, Comput. Math. Appl..
[10] Chia-Kuan Ting,et al. Determining economic lot size and number of deliveries for EPQ model with quality assurance using algebraic approach , 2010 .
[11] Chia-Kuan Ting,et al. Alternative approach for production lot size problem with scrap and cost reduction distribution policy , 2011 .
[12] Viliam Makis,et al. An EMQ model with inspections and random machine failures , 1998, J. Oper. Res. Soc..