Unit-Contingent Power Purchase Agreement and Asymmetric Information about Plant Outage

This paper analyzes a unit-contingent power purchase agreement between an electricity distributor and a power plant. Under such a contract the distributor pays the plant a fixed price if the plant is operational and nothing if plant outage occurs. Pricing a unit-contingent contract is complicated by the fact that the plant's true status is its private information. The difference between the electricity spot price and the unit-contingent contract price provides an incentive for the plant to misreport its status and earn profit at the distributor's expense. To prevent misreporting, the distributor may inspect the plant and levy penalties if misreporting is discovered. We find that some type of misreporting under certain circumstances can benefit both the plant and the distributor, because it serves as a risk-allocation mechanism between the two parties. We show that such a risk-allocation mechanism is equivalent to using state-contingent options and prohibiting misreporting.

[1]  Joel S. Demski,et al.  Resolving double moral hazard problems with buyout agreements , 1991 .

[2]  P. Correia,et al.  Games with incomplete and asymmetric information in poolco markets , 2005, IEEE Transactions on Power Systems.

[3]  Tao Li,et al.  Strategic bidding of transmission-constrained GENCOs with incomplete information , 2005, IEEE Transactions on Power Systems.

[4]  Luciano Messori The Theory of Incentives I: The Principal-Agent Model , 2013 .

[5]  Harvey Diamond,et al.  Minimax Policies for Unobservable Inspections , 1982, Math. Oper. Res..

[6]  S. M. Shahidehpour,et al.  Application of games with incomplete information for pricing electricity in deregulated power pools , 1998 .

[7]  C. Tapiero,et al.  Contract design and the control of quality in a conflictual environment , 1995 .

[8]  J. Harsanyi Games with Incomplete Information Played by “Bayesian” Players Part II. Bayesian Equilibrium Points , 1968 .

[9]  Arnold W.A. Boot,et al.  Reputation and discretion in financial contracting , 1993 .

[10]  Ali Hortaçsu,et al.  Understanding strategic bidding in multi‐unit auctions: a case study of the Texas electricity spot market , 2008 .

[11]  M. Whinston,et al.  Incomplete Contracts and Strategic Ambiguity , 1998 .

[12]  S. Oren,et al.  Electricity derivatives and risk management , 2005 .

[13]  Melvin Dresher,et al.  A Sampling Inspection Problem in Arms Control Agreements: A Game-Theoretic Analysis , 1962 .

[14]  M. Dufwenberg Game theory. , 2011, Wiley interdisciplinary reviews. Cognitive science.

[15]  John C. Harsanyi,et al.  Games with Incomplete Information Played by "Bayesian" Players, I-III: Part I. The Basic Model& , 2004, Manag. Sci..

[16]  C. Tapiero,et al.  The delivery and control of quality in supplier-producer contracts , 1995 .

[17]  Roger B. Myerson,et al.  Optimal Auction Design , 1981, Math. Oper. Res..

[18]  J. Harsanyi Games with Incomplete Information Played by 'Bayesian' Players, Part III. The Basic Probability Distribution of the Game , 1968 .

[19]  Jean-Jacques Laffont,et al.  A complete solution to a class of principal-agent problems with an application to the control of a self-managed firm , 1984 .

[20]  R. Myerson Incentive Compatibility and the Bargaining Problem , 1979 .

[21]  R. Townsend Optimal contracts and competitive markets with costly state verification , 1979 .

[22]  Dilip Mookherjee,et al.  Optimal Auditing, Insurance, and Redistribution , 1989 .

[23]  Ryan Wiser,et al.  Comparing the risk profiles of renewable and natural gas-fired electricity contracts , 2004 .

[24]  Ryan Wiser,et al.  Comparing the risk profiles of renewable and natural gas electricity contracts: A summary of the California Department of Water Resources contracts , 2003 .

[25]  R Avenhaus Playing for time: A sequential inspection game , 2004 .

[26]  P. Spreij Probability and Measure , 1996 .

[27]  Mohammad Shahidehpour,et al.  Market operations in electric power systems , 2002 .

[28]  Jennifer F. Reinganum,et al.  INCOME TAX COMPLIANCE IN A PRINCIPAL-AGENT FRAMEWORK , 1985 .

[29]  Stephen R. Koontz,et al.  Integrating Long-Term and Short-Term Contracting in Beef Supply Chains , 2011, Manag. Sci..

[30]  Unit-Contingent Power Purchase Agreement and Asymmetric Information about Plant Outage , 2011 .