Insurance as a Risk Management Tool for ADR Implementation in Construction Disputes

Nowadays, along with the inherent intricacy and magnitude of large-scale construction projects come increasingly complex disputes. Because most projects operate on tight budgets, alternative dispute-resolution (ADR) techniques such as negotiation, mediation, and arbitration are being widely adopted in large-scale construction projects to help handle disputes in more effective and cost-saving ways. However, the risk of incurring uncertain ADR-implementation costs in the dispute-resolution process has become an important issue. The traditional self-insured approach of simply retaining all risks is no longer considered economical. One way to reduce the potential for variations in the dispute-resolution budget is to price ADR techniques as an insurance product, which allows project participants to transfer the risk of incurring unexpectedly high ADR-implementation costs to the insurance company. Despite this advantage, many factors are preventing project participants from investing in ADR-implementation insur...

[1]  D. E. Bell,et al.  Decision making: Descriptive, normative, and prescriptive interactions. , 1990 .

[2]  Carol Menassa,et al.  An Option Pricing Model to Evaluate ADR Investments in AEC Construction Projects under Different Scenarios , 2007 .

[3]  Ali Touran,et al.  Probabilistic Model for Cost Contingency , 2003 .

[4]  Marvin Rausand,et al.  System Reliability Theory: Models, Statistical Methods, and Applications , 2003 .

[5]  G. Edward Gibson,et al.  Quantification of costs for dispute resolution procedures in the construction industry , 2006 .

[6]  Thomas B. Treacy USE OF ALTERNATIVE DISPUTE RESOLUTION IN THE CONSTRUCTION INDUSTRY , 1995 .

[7]  Carol C. Menassa,et al.  Study of Real Options with Exogenous Competitive Entry to Analyze Dispute Resolution Ladder Investments in Architecture, Engineering, and Construction Projects , 2010 .

[8]  K. Kovach Mediation: Principles and Practice , 1994 .

[9]  James L. Athearn,et al.  Risk Management and Insurance , 2003, International Journal of Innovative Technology and Exploring Engineering.

[10]  H. Raiffa,et al.  Decisions with Multiple Objectives , 1993 .

[11]  Ralph L. Keeney,et al.  Decisions with multiple objectives: preferences and value tradeoffs , 1976 .

[12]  Carlos A. Arboleda,et al.  The Potential Use Of Insurance As A Risk Management Tool For ADR Implementation In Construction Disputes , 2009 .

[13]  D. Sean McCone,et al.  Introduction to construction dispute resolution , 2003 .

[14]  The Application of Utility Theory in the Decision-Making Process for Investing in ADR Insurance , 2010 .

[15]  Kathleen M. J. Harmon,et al.  Resolution of Construction Disputes: A Review of Current Methodologies , 2003 .

[16]  Ali Touran Calculation of contingency in construction projects , 2003, IEEE Trans. Engineering Management.

[17]  Wilson H. Tang,et al.  Probability Concepts in Engineering: Emphasis on Applications to Civil and Environmental Engineering , 2006 .

[18]  R. L. Keeney,et al.  Decisions with Multiple Objectives: Preferences and Value Trade-Offs , 1977, IEEE Transactions on Systems, Man, and Cybernetics.

[19]  John Norstad,et al.  An Introduction to Utility Theory , 2005 .

[20]  S. Harrington,et al.  Risk Management and Insurance , 1998 .