Heat recovery steam generator (HRSG) is a major component of a combined cycle power plant (CCPP). This equipment is particularly subject to severe thermal stress especially during cold start-up period. Hence, it is important to predict the operational parameters of HRSGs such as temperature of steam, water, hot gas and tube metal of heating elements as well as pressure change in drums during transient and steady-state operation. These parameters may be used for estimating thermal and mechanical stresses which are important in HRSG design and operation.
In this paper, the results of a developed thermal model for predicting the working conditions of HRSG elements during transient and steady-state operations are reported. The model is capable of analysing arbitrary number of pressure levels and any number of elements such as superheater, evaporator, economizer, deaerator, desuperheater, reheater, as well as duct burners.
To assess the correct performance of the developed model two kinds of data verification were performed. In the first kind of data verification, the program output was compared with the measured data collected from a cold start-up of an HRSG at Tehran CCPP. The variations of gas, water/steam and metal temperatures at various sections of HRSG, and pressure in drums were among the studied parameters. Mean differences of about 3.8% for temperature and about 9.2% for pressure were observed in this data comparison. In the second kind of data verification, the steady-state numerical output of the model was checked with the output of the well-known commercial software. An average difference of about 1.5% was found between the two latter groups of data. Copyright © 2007 John Wiley & Sons, Ltd.
[1]
Dietmar Dr. Schmidt,et al.
The Model Steam Turbine: More Details About the Heat Recovery Steam Generator Evaluating Method in a Combined Cycle Plant
,
2002
.
[2]
Sepehr Sanaye,et al.
Performance Assessment of a Transient Model for HRSGs in Combined Cycle Power Plants
,
2003
.
[3]
P J Dechamps,et al.
Modelling the Transient Behaviour of Heat Recovery Steam Generators
,
1995
.
[4]
Frank Kreith,et al.
The CRC handbook of mechanical engineering
,
1998
.
[5]
D. F. Peterson,et al.
Standard Methods Of Hydraulic Design For Power Boilers
,
1988
.
[6]
Akber Pasha.
Combined Cycle Power Plant Start-up Effects and Constraints of the HRSG
,
1992
.
[7]
R. Bartlett,et al.
Steam turbine performance and economics
,
1958
.
[8]
Heimo Walter,et al.
Flow Stability of Heat Recovery Steam Generators
,
2006
.
[9]
M. P. Vukalovitch.
Thermodynamic properties of water and steam
,
1958
.
[10]
J. Thome,et al.
Convective Boiling and Condensation
,
1972
.
[11]
Sung Tack Ro,et al.
Dynamic behaviour analysis of a heat recovery steam generator during start-up
,
2000
.