Profitability Optimization of Construction Project Using Genetic Algorithm Cash Flow Model
暂无分享,去创建一个
[1] Huan Neng Chiu,et al. An efficient search procedure for the resource-constrained multi-project scheduling problem with discounted cash flows , 2002 .
[2] Shu-Shun Liu,et al. Resource-constrained construction project scheduling model for profit maximization considering cash flow , 2008 .
[3] Ashraf Elazouni,et al. Finance-based scheduling of construction projects using integer programming , 2004 .
[4] Shu-Shun Liu,et al. Profit Optimization for Multiproject Scheduling Problems Considering Cash Flow , 2010 .
[5] Paulo S. F. Barbosa,et al. A linear programming model for cash flow management in the Brazilian construction industry , 2001 .
[6] William J. O'Brien,et al. Assessing the Accuracy of Cash Flow Models: The Significance of Payment Conditions , 2005 .
[7] H. N. Ahuja,et al. Project management : techniques in planning and controlling construction projects / Hira N. Ahuja, S.P. Dozzi, S.M. Aourizk , 1994 .
[8] Jeffrey S. Russell,et al. Cash Flow Forecasting Model for General Contractors Using Moving Weights of Cost Categories , 2005 .
[9] K. Deb. Genetic algorithm in search and optimization: the technique and applications , 1998 .
[10] Frederick L. Blanchard. Engineering Project Management , 1990 .
[11] Raid Al-Aomar,et al. Analyzing the Impact of Negative Cash Flow on Construction Performance in the Dubai Area , 2012 .
[12] Ashraf Elazouni,et al. Finance-Based Scheduling: Tool to Maximize Project Profit Using Improved Genetic Algorithms , 2005 .
[13] Shu-Shun Liu,et al. Two‐stage profit optimization model for linear scheduling problems considering cash flow , 2009 .
[14] David E. Goldberg,et al. Genetic Algorithms in Search Optimization and Machine Learning , 1988 .