Mining technical dependencies throughout engineering process knowledge

Within the engineering of automated systems, different engineering disciplines are involved. Typically intermediate results from one discipline are handed over to another discipline. These results are refined throughout domain specific activities, and then handed over to other disciplines, incl. the originating one. This results in hidden dependencies between the involved disciplines, the planning assumptions as well as results, and the technical artefacts. This paper shows a method, proven in the engineering of automated plants in the metal industry, to gain explicit knowledge about the technical dependencies within the engineering of automated systems. Therefore the typical characteristics of the engineering process are described first, followed by a description how to capture the engineering process and a systematic approach to make these dependencies visible.

[1]  Michael Emes,et al.  5.5.3 Systems Engineering Management , 2004 .

[2]  R. Guillerm,et al.  Engineering dependability requirements for complex systems — A new information model definition , 2010, 2010 IEEE International Systems Conference.

[3]  Oded Maimon,et al.  The design process: properties, paradigms, and structure , 1997, IEEE Trans. Syst. Man Cybern. Part A.

[4]  Masaru Nakano,et al.  METHODOLOGY OF OUTSOURCING DESIGN AND ENGINEERING PROCESS , 2006 .

[5]  T. Tomiyama,et al.  Requirements for Complex Systems Modeling , 2008 .

[6]  A. Wiesner,et al.  An ontology-based environment for effective collaborative and concurrent process engineering , 2010, 2010 IEEE International Conference on Industrial Engineering and Engineering Management.

[7]  Hans Willars,et al.  Business Modeller’s Checklist: “Dos” and “Don’ts” in Hands-on Practice , 1999 .

[8]  Debasish Dutta,et al.  An approach to compute similarity between engineering changes , 2010, 2010 IEEE International Conference on Automation Science and Engineering.

[9]  Gabriela P. Henning,et al.  Modeling and understanding different types of process design activities , 2003 .

[10]  Wolter J. Fabrycky,et al.  Systems engineering and analysis , 1981 .

[11]  Hans-Erik Eriksson,et al.  Business Modeling with UML , 2001 .

[12]  Bashar Nuseibeh,et al.  Expressing the relationships between multiple views in requirements specification , 1993, Proceedings of 1993 15th International Conference on Software Engineering.

[13]  Kaoru Ishikawa Introduction to Quality Control , 1990 .

[14]  Karl Aspelund,et al.  The Design Process , 2006 .