UK construction processes and IT adoptability: Learning form other industries

Process improvement has been identified as a mechanism of achieving the desired performance improvements of the UK construction industry. During the recent past, researches within UK construction process improvement research paradigm have been influenced by the initiatives of other industries like manufacturing and software. Despite the success stories within such industries, the unique characteristics of the construction industry demand a careful consideration of the applicability of these approaches within a construction environment. Based on a literature review carried out by the authors, this paper discusses the nature of this applicability issue further. In addition to the above applicability issue, construction industry has suffered from a slow information technology (IT) adoptability issue, while IT has been considered as an effective enabler for process improvement in other industries. This has hindered the potential synergetic benefits of using IT within construction process improvement strategies. As such, it is important to understand the reasons behind this slow IT adoptability in order to ensure successful deployment of process improvement initiatives within the UK construction industry. This paper discusses this issue, by reviewing the literature to compare IT adoptability issues of the UK construction industry and other industries, with the aim of learning lessons from those to improve the UK construction industry.

[1]  J. Fairclough,et al.  RETHINKING CONSTRUCTION INNOVATION AND RESEARCH - A REVIEW OF THE GOVERNMENT'S R&D POLICIES AND PRACTICES , 2002 .

[2]  James T. O'Connor,et al.  Project Performance versus Use of Technologies at Project and Phase Levels , 2004 .

[3]  Stuart D. Green,et al.  Re-engineering construction: going against the grain , 2003 .

[4]  Peter E.D. Love,et al.  Employee empowerment in construction: an implementation model for process improvement , 2000 .

[5]  James A. Powell,et al.  Assessing the level of teamwork in Brazilian and English construction sites , 2001 .

[6]  Andrew M. Clark,et al.  Benchmarking the Use of IT to Support Supplier Management in Construction , 1999, J. Inf. Technol. Constr..

[7]  J A Brebner,et al.  When and how to assess fast-changing technologies: a comparative study of medical applications of four generic technologies. , 1997, Health technology assessment.

[8]  Ghassan Aouad,et al.  Technology management of IT in construction: a driver or an enabler? , 1999 .

[9]  Steven C. Wheelwright,et al.  Strategic Management of Technology and Innovation , 1992 .

[10]  R. Westrum The Social Construction of Technological Systems , 1989 .

[11]  M. Finnemore,et al.  Standardised Process Improvement for Construction Enterprises ( SPICE ) , 1998 .

[12]  JP Bunker,et al.  When and How to Assess Fast-changing Technologies: A Comparative Study of Medical Applications of Four Generic Technologies , 1998, BMJ.

[13]  Marjan Sarshar,et al.  Process improvement in facilities management: the SPICE approach , 2002, Bus. Process. Manag. J..

[14]  Margaret Reid,et al.  ALIGNING PROCESS AND MEANING: INNOVATING IN COMPLEX HEALTHCARE DELIVERY SYSTEMS , 2000 .

[15]  Carlos Torres Formoso,et al.  Setting stretch targets for driving continuous improvement in construction: analysis of Brazilian and UK practices , 2000 .

[16]  Per-Erik Josephson,et al.  Construction Process Improvement , 2003 .

[17]  H. Harrington,et al.  Improving business processes , 1991 .

[18]  Suzanne Garcia,et al.  Key Practices of the Capability Maturity Model, Version 1.1 , 1993 .

[19]  M. Hammer,et al.  REENGINEERING THE CORPORATION: A MANIFESTO FOR BUSINESS REVOLUTION , 1995 .

[20]  John Bessant,et al.  Developing strategic continuous improvement capability , 1999 .

[21]  F. Caeldries Reengineering the Corporation: A Manifesto for Business Revolution , 1994 .

[22]  Peter E.D. Love,et al.  Total quality management and the learning organization: a dialogue for change in construction , 2000 .

[23]  Peter E. D. Love,et al.  From BPR to CPR - conceptualising re-engineering in construction , 1998, Bus. Process. Manag. J..

[24]  R. Schroeder,et al.  A THEORY OF QUALITY MANAGEMENT UNDERLYING THE DEMING MANAGEMENT METHOD , 1994 .

[25]  Steve Clarke,et al.  A critique of BPR from a holistic perspective , 2001, Bus. Process. Manag. J..

[26]  R. Talwar Business re-engineering—a strategy-driven approach , 1993 .

[27]  Marjan Sarshar,et al.  SPICE: a business process diagnostics tool for construction projects , 2000 .

[28]  Ghassan Aouad,et al.  IT and the design and construction process: a conceptual model of co-maturation , 1997 .

[29]  Paul Lillrank,et al.  The Transfer of Management Innovations from Japan , 1995 .

[30]  Mark C. Paulk,et al.  Key Practices of the Capability Maturity Model , 1991 .

[31]  Peter Gyngell,et al.  Process Innovation: Reengineering Work through Information Technology , 1994 .

[32]  L. Koskela,et al.  Achieving Change in Construction , 2003 .

[33]  H. D. Wright,et al.  ICTs, videoconferencing and the construction industry: opportunity or threat? , 2001 .

[34]  Eric Deakins,et al.  What killed BPR?: some evidence from the literature , 1996, Proceedings of 1996 Information Systems Conference of New Zealand.

[35]  D. Sinclair,et al.  Business process re‐engineering and process management , 1995 .