In groundwater construction projects, many variables affect construction schedule and cost overruns. This paper aims to examine and evaluate the relative importance of the main factors that cause delay and cost overruns in groundwater construction projects. In order to identify these factors, a questionnaire survey was conducted. Questionnaires were sent to professionals involved in groundwater construction projects in Ghana. The data was analyzed and ranked, based on the profession of the respondents and their roles in the industry (i.e. owners, contractors and consultants). The questionnaire survey consisted of 49 factors which were grouped into nine major categories, and the level of importance of the categories was measured and ranked by the relative importance weights. The percentage agreements in ranking among the three groups were measured. The results shows that: (1) the surveyed groups generally agreed that the project financing category is the main reason for groundwater construction delay and cost overruns, whereas the labor category is the least; (2) owners, consultants and contractors substantially agree on the ranking of the major categories of delay and cost overruns factors. The paper concludes that all the three groups felt that project financing, micro-economics, natural conditions and materials factor categories play a predominant role in causing delay and cost overruns to groundwater construction projects.
[1]
M. M. Dlakwa,et al.
Reasons for overrun in public sector construction projects in Nigeria
,
1990
.
[2]
N. Mansfield,et al.
Causes of delay and cost overruns in Nigerian construction projects
,
1994
.
[3]
David Arditi,et al.
Cost overruns in public projects
,
1985
.
[4]
Ayman H. Al-Momani,et al.
Construction delay: a quantitative analysis
,
2000
.
[5]
S. Ogunlana,et al.
Construction delays in a fast-growing economy: Comparing Thailand with other economies
,
1996
.
[6]
Gary David Holt,et al.
Factors influencing construction time and cost overruns on high-rise projects in Indonesia
,
1997
.
[7]
Daniel C. Okpala,et al.
Causes of High Costs of Construction in Nigeria
,
1988
.
[8]
Mohammed Al-Khalil,et al.
Delay in public utility projects in Saudi Arabia
,
1999
.
[9]
Sadi Assaf,et al.
Causes of Delay in Large Building Construction Projects
,
1995
.