LINE BALANCING USING LARGEST CANDIDATE RULE ALGORITHM IN A GARMENT INDUSTRY: A CASE STUDY
暂无分享,去创建一个
[1] Daniel T. Jones,et al. The machine that changed the world : based on the Massachusetts Institute of Technology 5-million dollar 5-year study on the future of the automobile , 1990 .
[2] Nick Oliver,et al. Lean Production Practices: International Comparisons in the Auto Components Industry1 , 1996 .
[3] N Ismail,et al. Balancing of parallel assembly lines with mixed-model product , 2011 .
[4] Roger G. Schroeder,et al. Adoption of just-in-time manufacturing methods at US- and Japanese-owned plants: some empirical evidence , 1998 .
[5] Malcolm Smith,et al. Management practices and performance reporting in the Sri Lankan apparel sector , 2007 .
[6] Mikell P. Groover,et al. Automation, Production Systems, and Computer-Integrated Manufacturing , 1987 .
[7] Muhammad Ikhwan Jambak,et al. Soft Computing in Optimizing Assembly Lines Balancing , 2010 .
[8] Nick Oliver,et al. High-Performance Manufacturing: Evidence from the Automotive Components Industry , 1997 .
[9] Bengt Klefsjö,et al. The machine that changed the world , 2008 .
[10] Rachna Shah,et al. Defining and developing measures of lean production , 2007 .
[11] P. Mazany. A case study: Lessons from the progressive implementation of just‐in‐time in a small knitwear manufacturer , 1995 .
[12] Marc Anthony Schmidt,et al. Application of lean principles to an enterprise value stream : a lean analysis of an automotive fuel system development process , 2000 .
[13] Pär Åhlström,et al. Assessing changes towards lean production , 1996 .
[14] Karin Ackermann. Automation Production Systems And Computer Integrated Manufacturing , 2016 .