Goal directed life cycle costing as a method to evaluate the economic feasibility of office buildings with conventional and TI‐façades

Transparent insulation systems (TI‐systems) of less than 20cm thick have been developed as an alternative to opaque wall insulation and windows, which provide a financial return to building occupants when applied to building façades. Lack of detailed cost analysis of TI‐systems is a major constraint to the application of TI‐wall and TI‐glazing in buildings. A goal directed life cycle costing (LCC) technique and sensitivity analysis used to evaluate the economic feasibility of TI‐applications in office buildings form the basis of this research. It was undertaken as part of research to determine optimum energy and cost performance of TI‐systems for external cladding of high‐rise and low‐rise office buildings in temperate and tropical climates. The LCC of the buildings with conventional façades were compared with those with TI‐façades. The results show that LCC can be used to evaluate the economic feasibility of low carbon technologies such as TI‐systems effectively. A detailed account is provided of how different sources of cost data can be captured, collected and integrated to perform selective goal directed LCC analysis in the absence of detailed historical LCC data. The use of the goal directed LCC method and cost influence diagram presented in this research can be adopted as a standard method for assessing the economic feasibility of applying low carbon technologies to buildings.

[1]  Stéphane Citherlet,et al.  Window and advanced glazing systems life cycle assessment , 2000 .

[2]  David E. Shiers,et al.  The Green Guide to Specification: An Environmental Profiling System for Building Materials and Components , 2002 .

[3]  Bambang Trigunarsyah Project owners' role in improving constructability of construction projects: an example analysis for Indonesia , 2004 .

[4]  Christian Stoy,et al.  The determination of occupancy costs during early project phases , 2006 .

[5]  Richard Kirkham,et al.  Simulation of maintenance costs in UK local authority sport centres , 2004 .

[6]  L de Santoli,et al.  Use of an expert system rating for the energy performance of a building , 2005 .

[7]  Jean-Christophe Hadorn IEA SOLAR HEATING AND COOLING PROGRAMME TASK 32: ADVANCED STORAGE CONCEPTS FOR SOLAR AND LOW ENERGY BUILDINGS , 2006 .

[8]  Halim A. Boussabaine,et al.  Whole Life-Cycle Costing , 2004 .

[9]  Afif Hasan,et al.  Optimizing insulation thickness for buildings using life cycle cost , 1999 .

[10]  Will Hughes,et al.  Exposing the myth of the 1:5:200 ratio relating initial cost, maintenance and staffing costs of office buildings , 2004 .

[11]  Gf Menzies,et al.  Multiglazed windows: potential for savings in energy, emissions and cost , 2005 .

[12]  T.A.C. Dulley Solar Design—Components, Systems, Economics , 1990 .

[13]  Richard Kirkham,et al.  Whole Life-Cycle Costing: Risk and Risk Responses , 2003 .

[14]  Muhammad Asif,et al.  A value engineering analysis of timber windows , 2005 .

[15]  Ing Liang Wong Whole life costing: Towards a sustainable built environment , 2010 .

[16]  Allan Ashworth Estimating the life expectancies of building components in life‐cycle costing calculations , 1996 .

[17]  Richard Kirkham,et al.  Probability distributions of facilities management costs for whole life cycle costing in acute care NHS hospital buildings , 2002 .

[18]  Bjørn Berge,et al.  The Ecology of Building Materials , 2000 .

[19]  Davis Langdon Spon's Mechanical and Electrical Services Price Book 2009 , 2008 .

[20]  S. C. Sekhar,et al.  On the study of energy performance and life cycle cost of smart window , 1998 .

[21]  Langdon and Everest Davis Spon's mechanical and electrical services price book , 1988 .

[22]  Roger Flanagan,et al.  Life Cycle Costing for Construction , 2005 .

[23]  Richard Kirkham,et al.  Re‐engineering the whole life cycle costing process , 2005 .

[24]  Lu Aye,et al.  Environmentally sustainable development: a life-cycle costing approach for a commercial office building in Melbourne, Australia , 2000 .

[25]  S. Tassou,et al.  Measures used to lower building energy consumption and their cost effectiveness , 2002 .

[26]  Philip C. Eames,et al.  A review of transparent insulation systems and the evaluation of payback period for building applications , 2007 .

[27]  Raymond J. Cole,et al.  Life-cycle energy use in office buildings , 1996 .

[28]  David J. Edwards,et al.  Estimating life cycle plant maintenance costs , 2000 .

[29]  Stig-Inge Gustafsson,et al.  Optimisation of insulation measures on existing buildings , 2000 .