BIM-based framework for automatic scheduling of facility maintenance work orders

Abstract Although more than 65% of the total cost in facility management (FM) comes from facility maintenance management (FMM), there is a lack of efficient maintenance strategies and right decision making approaches to reduce FMM costs. Building information modeling (BIM) has been developed as a potential technology for FMM in buildings. This study proposes an FMM framework based on BIM and facility management systems (FMSs), which can provide automatic scheduling of maintenance work orders (MWOs) to enhance good decision making in FMM. In this framework, data are mapped between BIM and FMSs according to the Industry Foundation Classes (IFC) extension of maintenance tasks and MWO information in order to achieve data integration. After bi-directional data transmission between the BIM models and FMSs, work order information is visualized in BIM via API to identify components that have failed. Second, geometric and semantic information of the failure components is extracted from the BIM models to calculate the sub-optimal maintenance path in the BIM environment. Third, the MWO schedule is automatically generated using a modified Dijkstra algorithm that considers four factors, namely, problem type, emergency level, distance among components, and location. Illustrative examples are given in the paper to validate the feasibility and effectiveness of the proposed framework in indoor and outdoor 3D environments.

[1]  Sarel Lavy,et al.  A Case Study of Using BIM and COBie for Facility Management , 2014 .

[2]  Naser Hamdi,et al.  An Intelligent Healthcare Management System: A New Approach in Work-order Prioritization for Medical Equipment Maintenance Requests , 2012, Journal of Medical Systems.

[3]  Frits C. R. Spieksma,et al.  Modeling and solving the periodic maintenance problem , 2006, Eur. J. Oper. Res..

[4]  Chia-Hao Wu,et al.  3D spatial information for fire-fighting search and rescue route analysis within buildings , 2012 .

[5]  Tanyel Bulbul,et al.  An object-oriented model to support healthcare facility information management , 2013 .

[6]  Bernd Scholz-Reiter,et al.  Maintenance Work Order Based on Event-Driven Information of Condition-Monitoring Systems - A Genetic Algorithm for Scheduling and Rescheduling of Dynamic Maintenance Orders , 2012, LDIC.

[7]  D. N. Prabhakar Murthy,et al.  Optimal periodic preventive maintenance policy for leased equipment , 2006, Reliab. Eng. Syst. Saf..

[8]  Dana J. Vanier,et al.  Development of a maintenance management model based on IAI standards , 2001, Artif. Intell. Eng..

[9]  Raja R. A. Issa,et al.  Design for maintenance accessibility using BIM tools , 2014 .

[10]  Jack Chin Pang Cheng,et al.  A BIM-based automated site layout planning framework for congested construction sites , 2015 .

[11]  Nils J. Nilsson,et al.  A Formal Basis for the Heuristic Determination of Minimum Cost Paths , 1968, IEEE Trans. Syst. Sci. Cybern..

[12]  Xin Liu,et al.  A BIM-based framework for lift planning in topsides disassembly of offshore oil and gas platforms , 2017 .

[13]  X. Xu,et al.  Agent-oriented approach to work order management for circuit breaker maintenance , 2002, IEEE Power Engineering Society Summer Meeting,.

[14]  Amin Hammad,et al.  Knowledge-assisted BIM-based visual analytics for failure root cause detection in facilities management , 2014 .

[15]  Yu-Cheng Lin,et al.  Developing Mobile- and BIM-Based Integrated Visual Facility Maintenance Management System , 2013, TheScientificWorldJournal.

[16]  S. Alvarez-Romero,et al.  Use of Building Information Modeling technology in the integration of the handover process and facilities management , 2014 .

[17]  Paul M. Teicholz,et al.  BIM for facility managers , 2013 .

[18]  Hissam Tawfik,et al.  Path planning in construction sites: performance evaluation of the Dijkstra, A*, and GA search algorithms , 2002, Adv. Eng. Informatics.

[19]  Edsger W. Dijkstra,et al.  A note on two problems in connexion with graphs , 1959, Numerische Mathematik.

[20]  Arto Kiviniemi,et al.  BIM-FM Implementation: An Exploratory Invesigation , 2013, Int. J. 3 D Inf. Model..

[21]  Frank Schultmann,et al.  Building Information Modeling (BIM) for existing buildings — Literature review and future needs , 2014 .

[22]  Rajesh Kumar Chakrawarti,et al.  Increasing no. of nodes for Dijkstra algorithm without degrading the performance , 2013 .

[23]  Dana J. Vanier,et al.  Implementation of a distributed, model-based integrated asset management system , 2003, J. Inf. Technol. Constr..

[24]  Nan Li,et al.  Application Areas and Data Requirements for BIM-Enabled Facilities Management , 2012 .

[25]  Richard Bellman,et al.  Dynamic Programming Treatment of the Travelling Salesman Problem , 1962, JACM.

[26]  Robin Drogemuller,et al.  Towards sustainable facilities management , 2009 .

[27]  O. P. Gandhi,et al.  Equipment redesign feasibility through maintenance-work-order records using fuzzy cognitive maps , 2014, Int. J. Syst. Assur. Eng. Manag..

[28]  L. Volker,et al.  BIM in the operations stage: bottlenecks and implications for owners , 2015 .

[29]  Charles M. Eastman,et al.  BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors , 2008 .

[30]  B. Atkin,et al.  Total Facilities Management , 2000 .