Determining the amount of past investment property using the synthesis of cost evaluation methods

[1]  B. Flyvbjerg,et al.  Different Cost Performance: Different Determinants? The Case of Cost Overruns in Dutch Transport Infrastructure Projects , 2012, 1307.2179.

[2]  Bjørn Petter Jelle,et al.  Accelerated climate ageing of building materials, components and structures in the laboratory , 2012, Journal of Materials Science.

[3]  Geoffrey Qiping Shen,et al.  Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects , 2016 .

[4]  Mohsen Seifi,et al.  Metal Additive Manufacturing: A Review of Mechanical Properties , 2016 .

[5]  Sungwoo Moon,et al.  Stochastic Forecast of Construction Cost Index Using a Cointegrated Vector Autoregression Model , 2013 .

[6]  Niklaus Kohler,et al.  Building age as an indicator for energy consumption , 2015 .

[7]  Michael D. Sangid,et al.  The physics of fatigue crack initiation , 2013 .

[8]  Ruut Hannele Peuhkuri,et al.  Moisture and Bio-deterioration Risk of Building Materials and Structures , 2010 .

[9]  Jui-Sheng Chou,et al.  Cost simulation in an item-based project involving construction engineering and management , 2011 .

[10]  Jian Lu,et al.  Time Series Analysis of ENR Construction Cost Index , 2010 .

[11]  Min-Yuan Cheng,et al.  Web-based conceptual cost estimates for construction projects using Evolutionary Fuzzy Neural Inference Model , 2009 .

[12]  Chang-Taek Hyun,et al.  A CBR-based hybrid model for predicting a construction duration and cost based on project characteristics in multi-family housing projects , 2010 .

[13]  Arthur Yip,et al.  Historical construction costs of global nuclear power reactors , 2016 .

[14]  Heinz Werner Höppel,et al.  Cyclic deformation and fatigue properties of very fine-grained metals and alloys , 2010 .