Causes of delays in construction projects in Turkey

Abstract In both developing and industrialized countries, deviation from a planned time schedule is one of the most frequently encountered problems in construction investments. Various factors faced with during construction period prevent systematic flow of work, which causes time-based anomalies as a conclusion. Considering the vital importance of the construction industry on the macro-economic structure of a country, it is inevitable to be aware of considerable effect of the timely completion on the allocated project budget. In this study, causes of time extensions in the Turkish construction industry and levels of their importance were examined together. In total, 34 factors affecting project duration were taken into account. A questionnaire survey, including these factors, was then applied to 71 construction companies in Turkey, and the outcomes were evaluated by means of statistical analyses. According to the results, “design and material changes” was found to be the most predominant factor, followed...

[1]  T. Mezher,et al.  Causes of delays in the construction industry in Lebanon , 1998 .

[2]  D. Arditi,et al.  Reasons for delays in public projects in Turkey , 1985 .

[3]  F. C. Harris,et al.  Delays on Large Construction Projects , 1986 .

[4]  Sherif Ali Mohtady Mohamed,et al.  Factors affecting the performance of construction projects in the Gaza Strip , 2009 .

[5]  S. Keoki. Sears,et al.  Construction Project Management , 1972 .

[6]  Chabota Kaliba,et al.  Cost escalation and schedule delays in road construction projects in Zambia , 2009 .

[7]  Murali Sambasivan,et al.  Causes and effects of delays in Malaysian construction industry , 2007 .

[8]  Stephen O. Ogunlana,et al.  Problems causing delays in major construction projects in Thailand , 2008 .

[9]  George J. Ritz Total Construction Project Management , 1993 .

[10]  Faisal Manzoor Arain,et al.  Causes of variation orders in construction projects in the Gaza Strip , 2010 .

[11]  Tommy Y. Lo,et al.  Construction Delays in Hong Kong Civil Engineering Projects , 2006 .

[12]  Ayman Abu Hammad,et al.  Delays in construction projects: The case of Jordan , 2008 .

[13]  Serdar Ulubeyli,et al.  Cost and Time Focused Risk Analysis in the Turkish Construction Industry , 2009 .

[14]  R. Hitchcock,et al.  The causes of variation , 1884, American Journal of Science.

[15]  Sameh M. El-Sayegh,et al.  Significant factors causing delay in the UAE construction industry , 2006 .

[16]  Hesham A. Bassioni,et al.  Causes of Delay in Building Construction Projects in Egypt , 2008 .

[17]  Martin Skitmore,et al.  Causes of delays in Saudi Arabian public sector construction projects , 2009 .

[18]  Richard Savage Factors affecting project-based learning practices , 2012 .

[19]  A. Standen Causes and Effects. , 1957, Science.

[20]  Lynn Crawford,et al.  Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study , 2003 .

[21]  Stephen O. Ogunlana,et al.  Large construction projects in developing countries: a case study from Vietnam , 2004 .

[22]  Gary David Holt,et al.  Factors influencing construction time and cost overruns on high-rise projects in Indonesia , 1997 .

[23]  N. Kartam,et al.  Delays and cost increases in the construction of private residential projects in Kuwait , 2005 .

[24]  Ajibade A. Aibinu,et al.  Construction delays and their causative factors in Nigeria , 2006 .

[25]  John R. Baldwin,et al.  Causes of Delay in the Construction Industry , 1971 .