Coordinated robots in a flexible manufacturing work cell
暂无分享,去创建一个
[1] R. P Baker,et al. An architecture for the vertical integration of tooling considerations from design to process planning , 2000 .
[2] Devendra P. Garg,et al. A numerical optimization approach for tuning fuzzy logic controllers , 1999, IEEE Trans. Syst. Man Cybern. Part B.
[3] J. Norberto Pires,et al. Object-oriented and distributed approach for programming robotic manufacturing cells , 2000 .
[4] Devendra P. Garg,et al. Neural Net Applications , 1999 .
[5] Lakhmi C. Jain,et al. Neural network applications , 1995, Proceedings Electronic Technology Directions to the Year 2000.
[6] Kjell B. Zandin,et al. MOST® Work Measurement Systems , 1990 .
[7] R. Mattone,et al. Sorting of items on a moving conveyor belt. Part 1: a technique for detecting and classifying objects , 2000 .
[8] Makoto Sato,et al. Distributed autonomic tool management method based on intelligent cutting tools , 1992 .
[9] Naoki Hirabayashi,et al. A Method for Distributing Tools in Flowshop-Type Flexible Manufacturing Systems , 1992 .
[10] G C Onwubolu,et al. Manufacturing cell scheduling using genetic algorithms , 2000 .
[11] Bertrand M. T. Lin,et al. Makespan minimization in the two‐machine flowshop batch scheduling problem , 2000 .
[12] Janez Grum,et al. Operation lead time control , 2000 .