Cost evaluation in design with form features

Reducing the cost of a product at the design stage is more effective than at the manufacturing stage. In this paper, an attempt is presented to quantify the manufacturing cost in feature-based design. Machining form features are classified as simple and complex. The machining cost of a part depends not only on the type of form features, but also on the relationship among the features. This cost is calculated for four different cases: traditional machining, simultaneous machining, simultaneous set-up and changeover, and multiple machine tools. A manufacturing process is represented with a digraph. The feature-based evaluation of manufacturing cost is formulated as the shortest path problem, and a mathematical model as well as an algorithm are presented to determine the minimum cost design alternative.

[1]  Hong-Chao Zhang,et al.  Computer Aided Process Planning: the state-of-the-art survey , 1989 .

[2]  Cheng-Jung Lin,et al.  Optimal operation planning and sequencing: minimization of tool changeovers , 1993 .

[3]  Muzaffar Shaikh,et al.  Minimization of drilling costs: a closed-form solution , 1992 .

[4]  Andrew Kusiak,et al.  Design of tolerances for quality , 1994 .

[5]  Andrew Kusiak,et al.  Constraint-based design of parts , 1995, Comput. Aided Des..

[6]  D. Nau,et al.  An Algebraic Approach to Feature Interactions , 1992, IEEE Trans. Pattern Anal. Mach. Intell..

[7]  Andrew Kusiak,et al.  Concurrent Engineering: Automation, Tools, and Techniques , 1992 .

[8]  Mikell P. Groover,et al.  Automation, Production Systems, and Computer-Integrated Manufacturing , 1987 .

[9]  Salah E. Elmaghraby,et al.  Activity networks: Project planning and control by network models , 1977 .

[10]  Kristin L. Wood,et al.  Representing and manipulating interacting and interfeature relationships in engineering design for manufacture , 1990, DAC 1990.

[11]  Paul K. Wright,et al.  Automating process planning: Using feature interactions to guide search , 1989 .

[12]  Edsger W. Dijkstra,et al.  A note on two problems in connexion with graphs , 1959, Numerische Mathematik.

[13]  Nand K. Jha Stochastic mathematical modelling and manufacturing cost estimation in uncertain industrial environment , 1992 .

[14]  Sanjay B. Joshi,et al.  Recognizing multiple interpretations of interacting machining features , 1994, Comput. Aided Des..

[15]  Stelios Kafandaris,et al.  Expert Process Planning for Manufacturing , 1990 .

[16]  Yong Se Kim,et al.  COMPUTERS IN ENGINEERING , 1994 .

[17]  John R. Dixon,et al.  Design Theory and Methodology , 1989 .

[18]  Andrew Kusiak Intelligent Design and Manufacturing , 1992 .

[19]  D. V. Steward Systems Analysis and Management: Structure, Strategy and Design , 1981 .