A Method for Dynamic Risk Assessment and Management of Rockbursts in Drill and Blast Tunnels

Focusing on the problems caused by rockburst hazards in deep tunnels, such as casualties, damage to construction equipment and facilities, construction schedule delays, and project cost increase, this research attempts to present a methodology for dynamic risk assessment and management of rockbursts in D&B tunnels. The basic idea of dynamic risk assessment and management of rockbursts is determined, and methods associated with each step in the rockburst risk assessment and management process are given, respectively. Among them, the main parts include a microseismic method for early warning the occurrence probability of rockburst risk, an estimation method that aims to assess potential consequences of rockburst risk, an evaluation method that utilizes a new quantitative index considering both occurrence probability and consequences for determining the level of rockburst risk, and the dynamic updating. Specifically, this research briefly describes the referenced microseismic method of warning rockburst, but focuses on the analysis of consequences and associated risk assessment and management of rockburst. Using the proposed method of risk assessment and management of rockburst, the occurrence probability, potential consequences, and the level of rockburst risk can be obtained in real-time during tunnel excavation, which contributes to the dynamic optimisation of risk mitigation measures and their application. The applicability of the proposed method has been verified by those cases from the Jinping II deep headrace and water drainage tunnels at depths of 1900–2525 m (with a length of 11.6 km in total for D&B tunnels).

[1]  H H Einstein THE TUNNEL COST MODEL. A METHOD FOR CALCULATING BUILDING COSTS AND THE TIME NEEDED TO BUILD TUNNELS THROUGH ROCK , 1977 .

[2]  Gregory B. Baecher,et al.  Probabilistic and statistical methods in engineering geology , 1983 .

[3]  Herbert H. Einstein,et al.  Risk Analysis For Tunneling Projects Using Bayesian Networks , 2007 .

[4]  Xiao Yaxun,et al.  EVOLUTION LAW AND MECHANISM OF ROCKBURST IN DEEP TUNNEL:TIME DELAYED ROCKBURST , 2012 .

[5]  Wulf Schubert Risk oriented design and construction of tunnels , 2011 .

[6]  Bernhard Kohl,et al.  AUSTRIAN RISK ANALYSIS FOR ROAD TUNNELS - DEVELOPMENT OF A NEW METHOD FOR THE RISK ASSESSMENT OF ROAD TUNNELS , 2007 .

[7]  J. K. Vrijling,et al.  An analysis of the valuation of a human life , .

[8]  Qiu Shili EVOLUTION LAW AND MECHANISM OF ROCKBURSTS IN DEEP TUNNELS: IMMEDIATE ROCKBURST , 2012 .

[9]  A. Mendecki Seismic Monitoring in Mines , 2011 .

[10]  Herbert H. Einstein Risk and risk analysis in rock engineering , 1996 .

[11]  L Sousa.Rita,et al.  Risk analysis for tunneling projects , 2010 .

[12]  Xia-Ting Feng,et al.  Rockburst Risk Analysis Based on Microseismic Monitoring in Deep-Buried Tunnel with TBM Excavation , 2013 .

[13]  Herbert H. Einstein Landslide risk – Systematic approaches to assessment and management , 2018 .

[14]  Yang Yu,et al.  Studies on the evolution process of rockbursts in deep tunnels , 2012 .

[15]  B Kohl,et al.  Risk Analysis for Road Tunnels , 2007 .

[16]  Yang Yu,et al.  A Microseismic Method for Dynamic Warning of Rockburst Development Processes in Tunnels , 2015, Rock Mechanics and Rock Engineering.

[17]  H. H. Einstein,et al.  Warning systems for natural threats , 2007 .

[18]  Johan Wesseloo,et al.  Risk as a rock Engineering design Criterion , 2007 .

[19]  R. Sturk,et al.  Risk and decision analysis for large underground projects, as applied to the Stockholm Ring Road tunnels , 1996 .

[20]  David S. Bowles,et al.  ALAMO DAM DEMONSTRATION RISK ASSESSMENT , 1999 .

[21]  A. Hirata,et al.  Safety Management Based on Detection of Possible Rock Bursts by AE Monitoring during Tunnel Excavation , 2007 .

[22]  Yves Potvin,et al.  Results from microseismic monitoring, conventional instrumentation, and tomography surveys in the creation and thinning of a burst-prone sill pillar , 1992 .

[23]  Hyo-Nam Cho,et al.  Risk Assessment Methodology for Underground Construction Projects , 2004 .

[24]  James Kennedy,et al.  Particle swarm optimization , 2002, Proceedings of ICNN'95 - International Conference on Neural Networks.

[25]  E. T. Brown,et al.  Risk assessment and management in underground rock engineering—an overview , 2012 .

[26]  John A. Hudson,et al.  Rock Engineering Risk , 2015 .

[27]  Per Tengborg,et al.  Guidelines for tunnelling risk management: International Tunnelling Association, Working Group No. 2 , 2004 .

[28]  Herbert H. Einstein,et al.  Risk analysis during tunnel construction using Bayesian Networks: Porto Metro case study , 2011 .

[29]  Herbert Einstein,et al.  Warning System for Natural Threats , 2016 .

[30]  Håkan Stille,et al.  Model for Estimation of Time and Cost for Tunnel Projects Based on Risk Evaluation , 2005 .