On-site construction productivity in Malaysian infrastructure projects

Purpose The purpose of this paper is to examine the factors constraining the on-site construction productivity and measures for its improvement in Malaysian construction industry. Design/methodology/approach Questionnaire survey is administered to 171 respondents, comprising government authorities and construction players. A total of 39 constraints are found to be significant factors in various risk levels. Findings Consequently, improvement measures are recommended addressing those constraints to on-site construction productivity. It is believed that the findings of this study will assist in achieving high level of on-site construction productivity by focusing and acting upon the most risky constraints, where construction players in Malaysia could be guided well in their efforts in a time-, cost- and quality-effective manner. Originality/value It is believed that the findings of this study will assist in achieving high level of on-site construction productivity by focusing and acting upon the most risky constraints, where construction players in Malaysia could be guided well in their efforts in a time-, cost- and quality-effective manner.

[1]  Serdar Ulubeyli,et al.  Effect of basic motivational factors on construction workforce productivity in turkey , 2008 .

[2]  Stephen O. Ogunlana,et al.  Large construction projects in developing countries: a case study from Vietnam , 2004 .

[3]  Chen-Yu Chang,et al.  Rethinking the multi-attribute utility approach based procurement route selection technique , 2002 .

[4]  Paul. Olomolaiye,et al.  Problems influencing craftsmen's productivity in Nigeria , 1987 .

[5]  Abdulaziz M. Jarkas,et al.  Factors Affecting Construction Labor Productivity in Kuwait , 2012 .

[6]  Fereydoun Aghazadeh,et al.  Major factors influencing productivity of water and wastewater treatment plant construction: Evidence from the deep south USA , 2008 .

[7]  William Ibbs,et al.  Quantified Impacts of Project Change , 2007 .

[8]  S. Mohamed,et al.  FACTORS AFFECTING LABOUR PRODUCTIVITY IN BUILDING PROJECTS IN THE GAZA STRIP , 2007 .

[9]  Stuart D. Anderson,et al.  Framework for Competency and Capability Assessment for Resource Allocation , 2002 .

[10]  Shamil Naoum,et al.  Factors influencing the effectiveness of construction site managers , 1998 .

[11]  Simaan M. AbouRizk,et al.  Managing Performance in Construction , 2010 .

[12]  Durdyev Serdar Labour Productivity Improvement , 2014 .

[13]  M. Hosseini,et al.  A survey of the factors affecting the productivity of construction projects in Iran , 2012 .

[14]  Ka Chi Lam,et al.  Demotivating factors influencing the productivityof civil engineering projects , 2004 .

[15]  Bob McCulloch Automating Field Data Collection in Construction Organizations , 1997 .

[16]  Abang Abdullah Abang Ali,et al.  Factors affecting construction labour productivity for Malaysian residential projects , 2005 .

[17]  Jae-Jun Kim,et al.  Labour productivity model for reinforced concrete construction projects , 2011 .

[18]  Patricio A. Vela,et al.  Personnel tracking on construction sites using video cameras , 2009, Adv. Eng. Informatics.

[19]  Yong Bai,et al.  Improving On-Site Construction Productivity Using the WRITE System , 2009 .

[20]  Andy P. Field,et al.  Discovering Statistics Using SPSS , 2000 .

[21]  Andrew R.J. Dainty,et al.  Competency-Based Model for Predicting Construction Project Managers Performance , 2005 .

[22]  David W. Halligan,et al.  Action-Response Model and Loss of Productivity in Construction , 1994 .

[23]  Syuhaida Ismail,et al.  Pareto analysis of on-site productivity constraints and improvement techniques in construction industry , 2012 .

[24]  Seulkee Lee,et al.  Understanding and quantifying the impact of changes on construction labor productivity: Integration of productivity factors and quantification methods , 2007 .

[25]  Azam Forsberg The impact of labour productivity on the Swedish construction industries , 2007 .

[26]  Luis F. Alarcón,et al.  Analysis of Factors Influencing Productivity Using Craftsmen Questionnaires: Case Study in a Chilean Construction Company , 2011 .

[27]  Paul M. Goodrum,et al.  Latent Structures of the Factors Affecting Construction Labor Productivity , 2009 .

[28]  Mohd Shahir Liew,et al.  Malaysian Construction Sector and Malaysia Vision 2020: Developed Nation Status , 2014 .

[29]  Paul M. Goodrum,et al.  Construction Craft Workers’ Perceptions of the Factors Affecting Their Productivity , 2009 .

[30]  S El-Sabaa,et al.  The skills and career path of an effective project manager , 2001 .

[31]  Rafael Sacks,et al.  Relative Productivity in the AEC Industries in the United States for On-Site and Off-Site Activities , 2008 .

[32]  Jasper Mbachu,et al.  On-Site Labour Productivity of New Zealand Construction Industry: Key Constraints and Improvement Measures , 2011 .