Multiple and Long-Term Disturbance of Gob-Side Entry Retaining by Grouped Roof Collapse and an Innovative Adaptive Technology

The demand for gob-side entry retaining (GSER) technology is extensive in Chinese coal mines because of its outstanding advantages. However, due to the occurrence of long-term roof movement disturbances, maintaining the conventional GSER over long distances is difficult. The urgent demand for this technology and its difficult maintenance are prominent contradictions faced in its application. In this paper, two characteristics of strata movement after mining that have great influence on GSER are determined in a physical simulation experiment. One is that the roof layers, which are dominated by the key strata (KS), collapse in multiple groups to form two-directional periodic pressures and superposed disturbances. The other is that the movement of the main roof will experience three stages of deformation, as follows: bending subsidence before collapse, sinking deformation at collapse and compressive deformation after collapse. In particular, the gradual compression of the bulging gangue in the gob extends the disturbance cycle. Therefore, it is difficult to maintain the GSER over long distances because of the long-term and multiple breaking disturbances of the roof layers. Mechanical models of KS breaking and GSER are established, and a method to determine the timing and strength of KS disturbances are proposed. Making use of the characteristics of staged collapse and fluctuating weighting of the overlying strata, an innovative technology named short-staged GSER is proposed. This technology maintains the maximum length of GSER within the optimal length, which ensures that the entry avoids superposed disturbances, and reduces the maintenance difficulty. The method for determining the key technical parameters is discussed, and an engineering case in panel 24202 of the Shaqu Mine in China is presented. From a back-calculation of measurements, the engineering practice demonstrates that the surrounding rock mass is stable, and the deformed entry size is safe when the length of the short-staged GSER does not exceed 100 m.

[1]  Jiangwei Liu,et al.  The reasonable breaking location of overhanging hard roof for directional hydraulic fracturing to control strong strata behaviors of gob-side entry , 2018 .

[2]  Jun Yang,et al.  An Innovative Approach for Gob-Side Entry Retaining in Thick Coal Seam Longwall Mining , 2017 .

[3]  Ki-Il Song,et al.  Stabilization of Gob-Side Entry with an Artificial Side for Sustaining Mining Work , 2016 .

[5]  Debasis Deb,et al.  Numerical analysis of a longwall mining cycle and development of a composite longwall index , 2016 .

[6]  Xiangyu Wang,et al.  Failure mechanism and control of deep gob-side entry , 2015, Arabian Journal of Geosciences.

[7]  Shuqi Ma,et al.  Application of Hydraulic Fracturing and Energy-Absorption Rockbolts to Improve the Stability of a Gob-Side Roadway in a 10-m-Thick Coal Seam: Case Study , 2017 .

[8]  Jinfeng Ju,et al.  Structural characteristics of key strata and strata behaviour of a fully mechanized longwall face with 7.0 m height chocks , 2013 .

[9]  Fan Mingjian DEFORMATION CHARACTERISTICS OF SURROUNDING ROCK AND SUPPORTING TECHNOLOGY OF GOB-SIDE ENTRY RETAINING IN DEEP COAL MINE , 2010 .

[10]  Hideki Shimada,et al.  Application of the retained gob-side gateroad in a deep underground coalmine , 2016 .

[11]  Gangwei Fan,et al.  Structural effect of a soft–hard backfill wall in a gob-side roadway , 2011 .

[12]  Nong Zhang,et al.  Stability and deformation of surrounding rock in pillarless gob-side entry retaining , 2012 .

[13]  Yong Chen,et al.  An innovative approach for gob-side entry retaining in highly gassy fully-mechanized longwall top-coal caving , 2015 .

[14]  Wu Cai,et al.  Roadway Stagger Layout for Effective Control of Gob-Side Rock Bursts in the Longwall Mining of a Thick Coal Seam , 2015, Rock Mechanics and Rock Engineering.

[15]  Zhanguo Ma,et al.  Surrounding Rock Deformation Mechanism and Control Technology for Gob-Side Entry Retaining with Fully Mechanized Gangue Backfilling Mining: A Case Study , 2017 .

[16]  Xuehua Li,et al.  Numerical Investigation of the Effect of the Location of Critical Rock Block Fracture on Crack Evolution in a Gob-side Filling Wall , 2016, Rock Mechanics and Rock Engineering.

[17]  Yujing Jiang,et al.  Development of a New Gob-Side Entry-Retaining Approach and Its Application , 2018 .

[18]  Xiangyu Wang,et al.  Roof Deformation, Failure Characteristics, and Preventive Techniques of Gob-Side Entry Driving Heading Adjacent to the Advancing Working Face , 2015, Rock Mechanics and Rock Engineering.

[19]  Jianguo Ning,et al.  An Innovative Support Structure for Gob-Side Entry Retention in Steep Coal Seam Mining , 2017 .

[20]  Hideki Shimada,et al.  Optimization of hard roof structure over retained goaf-side gateroad by pre-split blasting technology , 2017 .

[21]  Majidreza Nazem,et al.  Numerical analysis of a large landslide induced by coal mining subsidence , 2017 .

[22]  Rajendra Singh,et al.  Field and numerical modelling studies for an efficient placement of roof bolts as breaker line support , 2017 .

[23]  Hongyun Yang,et al.  Soft Roof Failure Mechanism and Supporting Method for Gob-Side Entry Retaining , 2015 .

[24]  Hani S. Mitri,et al.  Numerical Approach for Goaf-Side Entry Layout and Yield Pillar Design in Fractured Ground Conditions , 2017, Rock Mechanics and Rock Engineering.

[25]  Yunliang Tan,et al.  Design and construction of entry retaining wall along a gob side under hard roof stratum , 2015 .

[26]  Nong Zhang,et al.  Pressure relief and structure stability mechanism of hard roof for gob-side entry retaining , 2015 .

[27]  Xiangyu Wang,et al.  An innovative approach for gateroad layout in highly gassy longwall top coal caving , 2013 .

[28]  Yuejin Zhou,et al.  Research on Coal PillarWidth in Roadway Driving AlongGoaf Based on The Stability of Key Block , 2015 .